Issue of Steel Slag Exceeding Environmental Standards at the Shibukawa Plant and Additional Remediation Costs
First written in FY2018-Q2. 5 of 6 entries say "Restated". Latest entry: FY2024.
No other company in this theme has enough history to compare yet.
- FY2024RestatedAnnual report
「Continuing investigations and measures after discussions with the national government, Gunma Prefecture and other local governments and private-sector parties」
The company reaffirms that discussions with local governments and private-sector parties, investigations and measures are continuing in relation to the Shibukawa Plant steel slag issue. - FY2022RestatedAnnual report
「Continuing investigations and measures after discussions with the national government, Gunma Prefecture and other local governments and private-sector parties」
The company reiterates that discussions with local governments and private-sector parties, investigations and measures are continuing in relation to the Shibukawa Plant steel slag issue. - FY2019RestatedAnnual report
「Regarding the issue of fluorine and other substances exceeding environmental standards detected in steel slag products from our Shibukawa Plant and in the soil directly beneath them, we are continuing investigations and measures after discussions with the national government, Gunma Prefecture, other local governments and private-sector parties. In accordance with the basic policy of the tripartite liaison committee comprising the national government, Gunma Prefecture and Shibukawa City in November 2015, we are implementing measures including surface covering.」
The company continues discussions with local governments and other parties, investigations and measures including surface covering in relation to the Shibukawa Plant steel slag issue. - FY2018RestatedAnnual report
「Regarding the issue of fluorine and other substances exceeding environmental standards detected in steel slag products from our Shibukawa Plant and in the soil directly beneath them, we are continuing investigations and measures after discussions with the national government, Gunma Prefecture, other local governments and private-sector parties.」
The company reiterates that discussions with local governments and other parties, investigations and measures are continuing in relation to the Shibukawa Plant steel slag issue. - FY2018-Q3RestatedAnnual report
「Regarding the issue of fluorine and other substances exceeding environmental standards detected in steel slag products from our Shibukawa Plant and in the soil directly beneath them, we are currently conducting investigations and implementing measures after discussions with the national government, Gunma Prefecture, other local governments and private-sector parties. In accordance with the basic policy of the tripartite liaison committee comprising the national government, Gunma Prefecture and Shibukawa City in November 2015, we are implementing measures including surface covering. We have also established a dedicated toll-free contact line on our website for inquiries about construction work using steel slag, but have received no inquiries concerning newly identified construction sites. However, for construction sites left in place after measures such as surface covering, additional measures may become necessary in the future to restore the sites to their original condition in connection with excavation resulting from land alteration, sale of the land or other events, and an appropriate share of the costs of such measures may be incurred.」
The company reiterates that investigations and measures including surface covering are continuing in relation to the Shibukawa Plant steel slag issue, and that additional remediation costs may arise in the future. - FY2018-Q2MaterialisedAnnual report
「Regarding the issue of fluorine and other substances exceeding environmental standards detected in steel slag products from our Shibukawa Plant and in the soil directly beneath them, we are currently conducting investigations and implementing measures after discussions with the national government, Gunma Prefecture, other local governments and private-sector parties. In accordance with the basic policy of the tripartite liaison committee comprising the national government, Gunma Prefecture and Shibukawa City in November 2015, we are implementing measures including surface covering. We have also established a dedicated toll-free contact line on our website for inquiries about construction work using steel slag, but have received no inquiries concerning newly identified construction sites. However, for construction sites left in place after measures such as surface covering, additional measures may become necessary in the future to restore the sites to their original condition in connection with excavation resulting from land alteration, sale of the land or other events, and an appropriate share of the costs of such measures may be incurred.」
The company reports that substances exceeding environmental standards were detected in steel slag products from the Shibukawa Plant and in the soil, and that investigations and measures including surface covering are under way. It also states that additional remediation costs may arise in the future in connection with land alteration, sale or other events.