Shinagawa Refra (5351) · InitiativeAdvanced
Reflecting Labor Cost Increases in Construction Contract Unit Prices
First written in FY2025-H1. 1 of 2 entries say "Advanced", first in FY2025. Latest entry: FY2025.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Improving Unprofitable Transactions and Revising Selling PricesA theme 18 companies write about · 0 as a headwind · 18 as a tailwind
The whole theme swung hardest in 2021: 1 of 6 companies on the "Worse" side.
8 other companies' latest entry also says "Advanced".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 18 companies compared. The sentences above are computed from all 18.Full recordFilings, disclosures and news, newest first
- FY2025AdvancedAnnual report
「In the Engineering segment, revenue for the current consolidated fiscal year was ¥25,730 million, up 4.8% year on year, due to revisions to construction contract prices in response to higher labor costs and an increase in construction projects.」
The reflection of higher labor costs in contract prices, first indicated in the first half, was confirmed as a full-year measure, and together with the increase in construction projects, contributed to a 4.8% increase in engineering revenue. - FY2025-H1First statedAnnual report
「While appropriately reflecting higher labor costs in construction contract prices」
In the engineering business, this is the first specific disclosure of measures to reflect higher labor costs in construction contract prices.