Toyo Asano Foundation (5271) · InitiativeDropped
Joint Development and Performance Certification of the Head Gear Pile Construction Method
First written in FY2018. 1 of 2 entries say "Dropped", first in FY2019. Latest entry: FY2019.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Development of Pile Products and Pile-Head Connection Methods and Obtaining Official ApprovalsA theme 3 companies write about · 0 as a headwind · 11 as a tailwind
0 other companies' latest entry also says "Dropped".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
- FY2019DroppedAnnual reportThe joint development and certification of the Head Gear Pile method described in the previous fiscal year cannot be confirmed in this filing.
- FY2018First statedAnnual report
「The Company jointly developed the double-tube precast pile method (Head Gear Pile method) with 3 general contractors and 1 pile manufacturer and obtained certification from the Japan Building Center.」
To enable rational design of the horizontal seismic force acting on the upper piles used in the pre-boring method, the Company jointly developed the method with 3 general contractors and 1 pile manufacturer and obtained certification from the Japan Building Center.