Toyo Asano Foundation (5271) · InitiativeAdvanced

Improving Pile-Body Performance for Major Earthquakes and Developing Short SC Piles

First written in FY2017. 2 of 5 entries say "Advanced", first in FY2020. Latest entry: FY2022.

5entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017ReframedFY2018RestatedFY2019AdvancedFY2020 – FY20222017: 120172018: 120182019: 120192020: 120202021: 020212022: 12022
Same theme, other companies
Development of Pile Products and Pile-Head Connection Methods and Obtaining Official ApprovalsA theme 3 companies write about · 0 as a headwind · 11 as a tailwind

2 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2022AdvancedAnnual report

    「Continuing from the previous consolidated fiscal year, we worked to develop pile bodies (HIT-TSPRC piles and HIT-TSPRC-ST piles) that reinforce the shear strength and axial load-bearing capacity required of precast concrete piles during earthquakes, and obtained an evaluation from the Japan Building Center.」

    Regarding improved pile-body performance during major earthquakes, development of HIT-TSPRC piles and HIT-TSPRC-ST piles progressed through obtaining evaluations from the Japan Building Center.
  2. FY2020AdvancedAnnual report

    「Continuing from the previous consolidated fiscal year, we worked to develop pile bodies (HIT-WSC piles) that reinforce the performance required of precast concrete pile bodies under major-earthquake conditions, including deformation performance, axial-force retention and load-bearing capacity, and obtained an evaluation from the Japan Building Center.」

    Development of HIT-WSC piles, which reinforce pile-body performance during major earthquakes, progressed through obtaining an evaluation from the Japan Building Center.
  3. FY2019RestatedAnnual report

    「We also continued from the previous consolidated fiscal year to develop pile bodies that reinforce the performance required of precast concrete pile bodies under major-earthquake conditions.」

    The company continues to develop pile bodies that reinforce the performance required of precast concrete piles during major earthquakes.
  4. FY2018ReframedAnnual report

    「The performance required of precast concrete piles during major earthquakes includes flexural strength, shear strength and deformation performance. Accordingly, we continued from the previous consolidated fiscal year to develop new pile bodies focused on these characteristics.」

    The focus on improving pile-body performance during major earthquakes continues, but the explanation now refers to developing new pile bodies rather than the previously described development and evaluation of short SC piles.
  5. FY2017First statedAnnual report

    「We continued our research and development efforts to improve the flexural strength, shear strength and deformation performance required of pile bodies during major earthquakes. As one way of addressing unevenness in the supporting ground, we developed short SC piles and obtained an evaluation from the Japan Building Center.」

    The company identifies improving pile-body performance during major earthquakes as an R&D theme and has progressed with short SC piles through obtaining an evaluation from the Japan Building Center.
Moved together

"Further Improvement in Construction Quality through Stronger Construction Management Systems" moved the same way as this thread, in the same document, in 2 of its 5 moves.

222★123
  1. ★This thread
  2. 1Further Improvement in Construction Quality through Stronger Construction Management Systems2×
  3. 2Larger-Diameter MRXX Pile Construction Method and Acquisition of Performance Evaluation2×
  4. 3Expansion of the concrete segment business centered on large-scale projects2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toyo Asano Foundation yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.