Toyo Asano Foundation (5271) · InitiativeDropped
Designated Contractor System for the Hyper-Straight Construction Method
First written in FY2017. 2 of 4 entries say "Dropped", first in FY2018. Latest entry: FY2020.
4entries
4years
0from disclosures
How it moved
Same theme, other companies
Development of a designated-contractor network for the Hyper-Straight methodA theme 1 companies write about · 0 as a headwind · 1 as a tailwind
No other company in this theme has enough history to compare yet.
Full recordFilings, disclosures and news, newest first
- FY2020DroppedAnnual reportThe acquisition of an evaluation and other matters concerning the Hyper Straight method described in the previous filing could not be confirmed in this filing.
- FY2019AdvancedAnnual report
「To expand the application range of the Hyper Straight method, one of our core construction methods, we worked to obtain regulatory approval for the evaluation formula for pullout strength and obtained an evaluation from the Japan Building Center.」
For the Hyper Straight method, whose description could not be confirmed in the previous filing, the company describes obtaining an evaluation concerning the evaluation formula for pullout strength to expand its application range. - FY2018DroppedAnnual reportThe designated contractor system for the Hyper Straight method described in the previous filing could not be confirmed in this filing.
- FY2017First statedAnnual report
「Together with other members of the joint certification group for the Hyper Straight method, one of our core construction methods, we certified designated contractors under the designated contractor system, which involves licensing the technology to other companies in the same industry.」
Together with the joint certification group, the company used the designated contractor system to certify designated contractors.