Komori
Toyo Asano Foundation (5271) · RiskRestated

Risks of quality deterioration and construction delays due to manufacturing or construction defects

First written in FY2017. 5 of 7 entries say "Restated". Latest entry: FY2026.

7entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017 – FY2020ReframedFY2021RestatedFY2025 – FY20262017: 120172018: 120182019: 120192020: 120202021: 120212022: 020222023: 020232024: 020242025: 120252026: 12026
Same theme, other companies
Risk of Litigation and Business Impact from Product Liability and Construction DefectsA theme 14 companies write about · 14 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2025: 1 of 8 companies on the "Worse" side.

10 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「However, if quality defects arise due to human error or unforeseeable reasons, the Group may fail to meet the quality required by customers, resulting in project delays and other consequences. In addition, if claims for damages or other claims arise due to defects, they may affect the Group's performance.」

    While addressing these matters through the Quality Control Committee and other bodies, the disclosure continues to identify the potential for failure to meet required quality standards, project delays and claims for damages.
  2. FY2025RestatedAnnual report

    「However, if quality defects arise due to human error or unforeseeable reasons, the Group may fail to meet the quality required by customers, resulting in project delays and other consequences.」

    While addressing these matters through the Quality Control Committee and other bodies, the disclosure continues to identify the potential for failure to meet required quality standards and project delays due to human error or unforeseeable defects.
  3. FY2021ReframedAnnual report

    「At the Quality Control Committee, which comprises the manufacturing, construction and sales divisions, the Group discusses issues in manufacturing, construction and other operations and strives to prevent problems and ensure high quality. However, if a defect arises because of human error or unforeseeable reasons, the required quality may not be met and construction schedules may be delayed.」

    While identifying the Quality Control Committee, comprising the manufacturing, construction and sales divisions, as the body responsible for addressing quality risks, the disclosure explicitly states the potential for failure to meet required quality standards and project delays due to human error or unforeseeable defects.
  4. FY2020RestatedAnnual report

    「The Group strives to ensure high quality in manufacturing, construction and other operations. However, if quality defects arise for unforeseeable reasons, quality may deteriorate and projects may be delayed. In addition, if claims for damages or other claims arise due to defects, they may affect the Group's performance.」

    The disclosure continues to identify the potential for quality deterioration, project delays and claims for damages arising from manufacturing and construction defects.
  5. FY2019RestatedAnnual report

    「The Group works to ensure high quality in manufacturing, construction and other operations, but if defects arise for unforeseeable reasons, quality may deteriorate and construction schedules may be delayed. In addition, if claims for damages or other claims arise due to defects, the Group may be affected.」

    The disclosure continues to identify the potential for quality deterioration, project delays and claims for damages arising from manufacturing and construction defects.
  6. FY2018RestatedAnnual report

    「The Group strives to ensure high quality in manufacturing, construction and other operations. However, if a defect arises for unforeseeable reasons, quality may deteriorate and construction schedules may be delayed.」

    The disclosure continues to identify the potential for quality deterioration, project delays and claims for damages arising from manufacturing and construction defects.
  7. FY2017First statedAnnual report

    「The Group works to ensure high quality in manufacturing, construction and other operations, but if defects arise for unforeseeable reasons, quality may deteriorate and construction schedules may be delayed. In addition, if claims for damages or other claims arise due to defects, the Group may be affected.」

    Subject to efforts to ensure high quality, the Group identifies quality deterioration, construction delays and claims for damages arising from unforeseeable defects.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Toyo Asano Foundation yet.
News