Komori
Asahi Concrete Works (5268) · RiskMaterialised

Deterioration in the Business Environment Due to Higher Overhead Costs

First written in FY2018-Q2. 3 of 6 entries say "Materialised", first in FY2020. Latest entry: FY2026.

6entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2018-Q2 – FY2018MaterialisedFY2020 – FY2023RestatedFY2025-H12017: 12018: 120182019: 020192020: 120202021: 020212022: 020222023: 120232024: 120242025: 020252026: 12026
Same theme, other companies

Asahi Concrete Works moved to the "Worse" side of this theme in 2020, 2 years before the typical company in this theme (2022).

The whole theme swung hardest in 2022: 28 of 41 companies on the "Worse" side.

6 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 50 companies compared. The sentences above are computed from all 50.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「However, delays in construction schedules caused by labor shortages and other factors, together with higher raw material prices, have kept the environment for profitability management increasingly challenging, making selective order acceptance difficult.」

    原材料価格の上昇が労働力不足による工期遅延とともに採算管理を厳しくする要因として、年度の実際の事業環境に現れている。
  2. FY2025-H1RestatedAnnual report

    「しかしながら、原材料高騰による原価上昇などにより採算管理は厳しい状況が続き、選別受注が一層難しい環境になりました。」

    原材料高騰による原価上昇が採算管理を厳しくする状況が続いていると再確認している。
  3. FY2023MaterialisedAnnual report

    「受注競争も激化し原材料高騰による原価上昇などにより厳しい状況が続きました。」

    原材料高騰による原価上昇が、受注競争の激化とともに当年度の事業環境に実際に現れている。
  4. FY2020MaterialisedAnnual report

    「当社の関連するコンクリート製品業界では、感染症流行の影響は未だ軽微でしたが、五輪関連の需要が出尽くし、人手不足や諸経費の上昇なども相俟って建設・土木関係の動きが総じて鈍くなったことから、厳しい事業環境が続きました。」

    諸経費の上昇が人手不足等とともに建設・土木関係の動きを鈍らせる要因として、当年度の実際の事業環境に現れている。
  5. FY2018DroppedAnnual report

    「建設土木業界では五輪関連等特需の遅れ等もあり、公共事業はもとより民間設備投資や住宅投資にも多くを期待し得ず、事業を取り巻く環境は厳しさを増しております。」

    当年度の事業環境説明では、従来記載された諸経費の上昇は独立した要因として記載されていない。
  6. FY2018-Q2First statedAnnual report

    「Labor shortages and rising overhead costs have combined to make the business environment more challenging.」

    In the concrete-products industry, rising overhead costs are identified for the first time as an independent factor worsening the business environment alongside labor shortages, public-works reductions and delayed orders.
Moved together

"Yen Appreciation, Falling Share Prices and Economic Uncertainty Resulting From Weak Emerging-Market Economies and Turmoil in the EU Framework" moved the same way as this thread, in the same document, in 3 of its 6 moves.

3222★1234
  1. ★This thread
  2. 1Yen Appreciation, Falling Share Prices and Economic Uncertainty Resulting From Weak Emerging-Market Economies and Turmoil in the EU Framework3×
  3. 2Rising Prices of Key Raw Materials2×
  4. 3Project Delays Caused by Labor Shortages2×
  5. 4Compliance With Laws and Regulations Through Policies, Training and Whistleblowing2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Asahi Concrete Works's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Deterioration in the Business Environment Due to Higher Overhead Costs | ASAHI CONCRETE WORKS CO.,LTD. (5268) | Komori