Announced details
Design of large-scale water electrolysis systems and hydrogen production equipment
Used in the design project for the relevant project
Our PlantStream is being used in a large-scale water electrolysis system design project undertaken by the two companies. Other capital or personnel relationships: Not disclosed.
In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.
Press release dated 6 March 2024; The Nikkei dated 17 March 2026
| Item | Details |
|---|---|
| Names of Products / Services Covered | PlantStream (automated plant design system) |
| Counterparty | TOYOTA MOTOR CORPORATION, Chiyoda Corporation |
| Relationship with the Company | Our PlantStream is being used in a large-scale water electrolysis system design project undertaken by the two companies. Other capital or personnel relationships: Not disclosed. |
| Applicable area | Design of large-scale water electrolysis systems and hydrogen production equipment |
| Usage history | Used in the design project for the relevant project |
| Source | Press release dated 6 March 2024; The Nikkei dated 17 March 2026 |
Items this document does not state (12)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.To explain the status of PlantStream’s use in the project following a 17 March 2026 report by The Nikkei on hydrogen production equipment. The announcement directs readers to the press release dated 6 March 2024 for details.