Risk of Delays and Failure to Achieve Results in New Technology Research and Development

First written in FY2021. 2 of 3 entries say "Reframed", first in FY2023. Latest entry: FY2026.

3entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2021ReframedFY2023 – FY20262021: 120212022: 020222023: 120232024: 020242025: 020252026: 12026
Same theme, other companies
Risk of R&D investments failing to deliver resultsA theme 116 companies write about · 116 as a headwind · 0 as a tailwind

TESS Holdings moved to the "Worse" side of this theme in 2023, 2 years before the typical company in this theme (2025).

The whole theme swung hardest in 2026: 14 of 29 companies on the "Worse" side.

6 other companies' latest entry also says "Reframed".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 116 companies compared. The sentences above are computed from all 116.
Full recordFilings, disclosures and news, newest first
  1. FY2026ReframedAnnual report

    「The Group is conducting research and development into battery storage system-related technologies, biomass fuel, supply-demand balancing and surplus electricity utilization technologies, among others. This research and development requires a long period of time and substantial expense.」

    The research and development risks have been organized around current priority areas, including battery storage system-related technologies, biomass fuel, and supply-demand balancing and surplus electricity utilization technologies.
  2. FY2023ReframedAnnual report

    「The Group is conducting research and development into biomass power generation systems, biomass fuel, battery storage systems, supply-demand balancing and surplus electricity utilization technologies, and geothermal power generation systems. This research and development requires a long period of time and substantial expense.」

    Supply-demand balancing and surplus electricity utilization technologies have been explicitly added to the existing research and development areas.
  3. FY2021First statedAnnual report

    「The Group is conducting research and development into biomass fuel, battery storage systems, small-scale wind power generation systems, biomass hot-water boilers and geothermal power generation systems. This research and development requires a long period of time and substantial expense.」

    The Group indicates the possibility that research and development in several new-energy fields may take longer, require additional costs and fail to achieve the expected results.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for TESS Holdings yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of Delays and Failure to Achieve Results in New Technology Research and Development | TESS Holdings Co.,Ltd. (5074) | Komori