Results for this period
First quarter1 July 2026–30 September 2026ConsolidatedJapanese GAAPThe width of the band at each stage is based on revenue. The narrower it becomes toward the bottom, the smaller the proportion of revenue that remains as profit. The dotted outline is the full-year forecast and the band inside it is the result for this period. The progress rate is the result divided by the forecast.
塗りつぶした部分が自己資本比率です。総資産のうち、返済のいらない自前の資金がどれだけかを表します。The thin vertical line indicates the level at the end of the previous fiscal year.
The Engineering business posted lower revenue and an expanded loss due to a decline in the number of projects and the limited revenue contribution from battery storage system projects. In the Energy Supply business, power generation and electricity sales revenue declined due to scheduled inspections and output curtailment, while some revenue increased through higher supply volumes under market-linked pricing plans, higher selling prices and an increase in unscheduled maintenance work.
No matters to report
| Item | Details |
|---|---|
| Fiscal Period Classification | First quarter |
| Accounting standards | Japanese GAAP |
| Consolidated / non-consolidated | Consolidated |
| Period Covered | 1 July 2026–30 September 2026 |
| Net Sales | ¥11,876 million (YoY -6.6%) |
| Operating profit | ¥-98 million |
| Ordinary income | ¥-552 million |
| Profit attributable to owners of the parent | ¥-565 million |
| Net income per share | △¥8.00 |
| Equity ratio | End of the current fiscal period 30.1 / End of previous period 31.6 |
| Total assets | ¥168,633 million |
| Net assets | ¥51,068 million |
| Full-year earnings forecast | Net Sales ¥64,000 million (YoY +25.0%) / Operating profit ¥4,700 million (YoY -11.8%) / Ordinary income ¥2,900 million (YoY -24.4%) / Net income ¥1,800 million (YoY -15.2%) |
| Revision to Earnings Forecast | No |
| Annual Dividend Forecast | ¥9.54 → ¥9.6(+0.6%) |
| Segment revenue | Engineering Business ¥4,093 million (YoY -27.5%), Energy Supply Business ¥7,783 million (YoY +10.2%) |
| Segment profit | Engineering Business ¥-180 million, Energy Supply Business ¥-49 million |
| Depreciation and amortization | ¥1,780 million |
| Impairment loss | None (material impairment loss related to property, plant and equipment) |
| Disclosure regarding the going concern assumption | No matters to report |
| Change in accounting policy | Changes due to revisions to standards No / Other changes No / Change in accounting estimate No / Restatement No |
| Changes in the scope of consolidation | New 0 / Excluded 0 / Company name Not applicable |
| Availability of Supplementary Financial Results Materials | Yes |
| Availability of Financial Results Briefing | Whether applicable Yes / Subject person Institutional investors and analysts |
| Issued Shares at Period-End | 70,773,230 Shares |
| Treasury Shares at Period-End | 130,156 Shares |
| Factors Behind Changes in Business Performance | The Engineering business posted lower revenue and an expanded loss due to a decline in the number of projects and the limited revenue contribution from battery storage system projects. In the Energy Supply business, power generation and electricity sales revenue declined due to scheduled inspections and output curtailment, while some revenue increased through higher supply volumes under market-linked pricing plans, higher selling prices and an increase in unscheduled maintenance work. |
Items this document does not state (11)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.In the Engineering business, the number of energy-saving equipment and solar power generation system projects declined, while battery storage system projects made only a limited contribution to revenue due to construction progress. In the Energy Supply business, power generation decreased due to scheduled inspections at the Saga-Imari Biomass Power Plant and output curtailment at the Fukuoka Miyako Mega Solar Power Plant and other facilities. On the other hand, some revenue increased due to the expansion of supply volumes under market-linked electricity pricing plans, higher selling prices and an increase in unscheduled maintenance work.