Komori
Other Disclosures5074TESS Holdings Co.,Ltd.Construction and Materials

We received an order from ごうぎんエナジー株式会社 for the installation of a solar power generation system (installation site: 青海流通センター株式会社’s 青海流通センター)

テス・エンジニアリング, a consolidated subsidiary, received an order from ごうぎんエナジー for EPC work to install solar power generation systems on 2 buildings at 青海流通センター. Delivery is scheduled for October 2026.

Worth reading
74In focus
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Improvement
Direction inferred from the company’s description.
Scale
3
MW (approximate generating capacity)
Wording
Conditional
How definitive the wording is.

Announced details

Solar power generation system installation (on-site PPA model, EPC)
Applicable field (uses covered by this announcement)

Power supply to Buildings 1 and 2 of 青海流通センター, renewable energy, and CO₂ emissions reduction

Launch dateOctober 2026 (scheduled delivery)
What the company reported numerically
Quantitative Effects

Estimated annual power generation: approximately 3.73 million kWh; estimated annual CO₂ emissions reduction: approximately 1,550 t-CO₂

Relationship between the counterparty and the company
TESS Holdings Co.,Ltd.5074
Relationship with the Company

ごうぎんエナジー will be the power generation operator, while テス・エンジニアリング will handle the EPC work for the solar power generation systems. テス・エンジニアリング is a consolidated subsidiary of テスホールディングス.

Counterpartyごうぎんエナジー株式会社

Head office: Matsue, Shimane Prefecture; Representative Director: Ajiki Tetsuya (安喰哲哉); 100% owned by The San-in Godo Bank,Ltd.

Location (as indicated in this announcement)

Koto-ku, Tokyo (青海流通センター)

Building 1: generating capacity of 1,510.08 kW, comprising 2,288 660W panels manufactured by AIKO Solar. Building 2: generating capacity of 1,481.04 kW, comprising 2,244 660W panels manufactured by AIKO Solar. Total: approximately 3.0 MW

In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.

Source (materials cited by the company)

Ministry of the Environment website, “List of Emission Factors by Electricity Retailer (for submissions in Reiwa 8).” The CO₂ emissions reduction was calculated using the alternative emission factor by electricity retailer of 0.000416 t-CO₂/kWh.

Announced details
ItemDetails
Names of Products / Services CoveredSolar power generation system installation (on-site PPA model, EPC)
Counterpartyごうぎんエナジー株式会社
Counterparty overviewHead office: Matsue, Shimane Prefecture; Representative Director: Ajiki Tetsuya (安喰哲哉); 100% owned by The San-in Godo Bank,Ltd.
Relationship with the Companyごうぎんエナジー will be the power generation operator, while テス・エンジニアリング will handle the EPC work for the solar power generation systems. テス・エンジニアリング is a consolidated subsidiary of テスホールディングス.
Launch dateOctober 2026 (scheduled delivery)
Applicable areaPower supply to Buildings 1 and 2 of 青海流通センター, renewable energy, and CO₂ emissions reduction
LocationKoto-ku, Tokyo (青海流通センター)
Location scaleBuilding 1: generating capacity of 1,510.08 kW, comprising 2,288 660W panels manufactured by AIKO Solar. Building 2: generating capacity of 1,481.04 kW, comprising 2,244 660W panels manufactured by AIKO Solar. Total: approximately 3.0 MW
Quantitative EffectsEstimated annual power generation: approximately 3.73 million kWh; estimated annual CO₂ emissions reduction: approximately 1,550 t-CO₂
SourceMinistry of the Environment website, “List of Emission Factors by Electricity Retailer (for submissions in Reiwa 8).” The CO₂ emissions reduction was calculated using the alternative emission factor by electricity retailer of 0.000416 t-CO₂/kWh.
Items this document does not state (8)
Contract ValueOffering priceContract DateAward/certification nameAwarding / certifying bodyRegistration number and expiry dateUsage historyImpact on Business Performance

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

To help reduce CO₂ emissions at 青海流通センター.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.
Corrections happenIf the company reissues this disclosure, the page is rebuilt from the corrected version and the revision number moves up.
We received an order from ごうぎんエナジー株式会社 for the installation of a solar power generation system (installation site: 青海流通センター株式会社’s 青海流通センター) | TESS Holdings Co.,Ltd. (5074) timely disclosure | Komori