On-site power generation for factory consumption, renewable energy, and CO₂ emissions reduction
Estimated annual generation: approximately 1.81 million kWh; expected to meet approximately 6.2% of the plant's annual electricity demand; estimated CO₂ emissions reduction: approximately 753 t-CO₂ per year
Tess Engineering delivered a solar power generation system for Hitachi Construction Machinery Co.,Ltd.'s Kasumigaura Plant. Tess Engineering is a consolidated subsidiary of the Company.
Head office: Taito-ku, Tokyo; Representative Executive Officer, President and COO: Senzaki Masafumi (先崎正文); Kasumigaura Plant location: Kasumigaura, Ibaraki Prefecture. No business description is provided.
Low-profile mounting system: Registered Trademark No. 6052650. Expiration date: Not disclosed
Kasumigaura, Ibaraki Prefecture (Hitachi Construction Machinery Co.,Ltd.'s Kasumigaura Plant)
In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.
Ministry of the Environment, “List of Emission Factors by Electricity Retailer (for Reiwa 8 submissions).” The alternative emission factor of 0.000416 t-CO₂/kWh for electricity retailers was used to calculate the CO₂ reduction.
| Item | Details |
|---|---|
| Names of Products / Services Covered | Solar power generation system |
| Counterparty | Hitachi Construction Machinery Co.,Ltd. |
| Counterparty overview | Head office: Taito-ku, Tokyo; Representative Executive Officer, President and COO: Senzaki Masafumi (先崎正文); Kasumigaura Plant location: Kasumigaura, Ibaraki Prefecture. No business description is provided. |
| Relationship with the Company | Tess Engineering delivered a solar power generation system for Hitachi Construction Machinery Co.,Ltd.'s Kasumigaura Plant. Tess Engineering is a consolidated subsidiary of the Company. |
| Launch date | February 2026 (delivery date; completed) |
| Applicable area | On-site power generation for factory consumption, renewable energy, and CO₂ emissions reduction |
| Registration number and expiry date | Low-profile mounting system: Registered Trademark No. 6052650. Expiration date: Not disclosed |
| Location | Kasumigaura, Ibaraki Prefecture (Hitachi Construction Machinery Co.,Ltd.'s Kasumigaura Plant) |
| Location scale | Generation capacity: 1,501.26 kW; 2,292 solar panels rated at 655 W each |
| Quantitative Effects | Estimated annual generation: approximately 1.81 million kWh; expected to meet approximately 6.2% of the plant's annual electricity demand; estimated CO₂ emissions reduction: approximately 753 t-CO₂ per year |
| Source | Ministry of the Environment, “List of Emission Factors by Electricity Retailer (for Reiwa 8 submissions).” The alternative emission factor of 0.000416 t-CO₂/kWh for electricity retailers was used to calculate the CO₂ reduction. |
Items this document does not state (7)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.To address challenges including the roof's load-bearing constraints, construction constraints associated with the waterproof-sheet method, and the need to ensure electrical equipment safety at a hydraulic equipment plant.