Komori
Other Disclosures5074TESS Holdings Co.,Ltd.Construction and Materials

We Received an Order from 高沢産業株式会社 for Construction Work to Install a Grid-Scale Battery Storage Facility

Tess Engineering, a consolidated subsidiary, received an order from 高沢産業株式会社 to construct a grid-scale battery storage facility with a capacity of approximately 8.9 MWh in Nogata, Fukuoka Prefecture. Delivery is scheduled for June 2027, after which Tess Engineering is also expected to provide maintenance, 24-hour remote monitoring, and operations management.

Worth reading
72In focus
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Improvement
Direction inferred from the company’s description.
Scale
8.944
MWh (capacity; 8,944 kWh in the facility specifications in the main text)
Wording
Conditional
How definitive the wording is.

Announced details

Grid-scale storage facilitiesConstruction and installationMaintenance24-hour remote monitoringOperations management (aggregation)
Applicable field (uses covered by this announcement)

Stabilization of power grids made unstable by the expansion of renewable energy power generation facilities and other factors

Launch dateJune 2027 (scheduled delivery)
Relationship between the counterparty and the company
TESS Holdings Co.,Ltd.5074
Relationship with the Company

Tess Engineering delivered solar power generation equipment to 高沢産業株式会社 in 2014, and the companies have maintained an ongoing business relationship through maintenance and other services. Tess Engineering is a consolidated subsidiary of the Company.

Counterparty高沢産業株式会社

Head office: Nagano, Nagano Prefecture; Representative Director and President: Takazawa Akihiro (高澤 曜宏). Operator of grid-scale battery storage facilities. Other attributes: Not disclosed.

Location (as indicated in this announcement)

Nogata, Fukuoka Prefecture

PCS output: 2,556 kW; capacity: 8,944 kWh (2 HUAWEI units rated at 4,472 kW each)

In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.

Announced details
ItemDetails
Names of Products / Services CoveredGrid-scale storage facilities, Construction and installation, Maintenance, 24-hour remote monitoring, Operations management (aggregation)
Counterparty高沢産業株式会社
Counterparty overviewHead office: Nagano, Nagano Prefecture; Representative Director and President: Takazawa Akihiro (高澤 曜宏). Operator of grid-scale battery storage facilities. Other attributes: Not disclosed.
Relationship with the CompanyTess Engineering delivered solar power generation equipment to 高沢産業株式会社 in 2014, and the companies have maintained an ongoing business relationship through maintenance and other services. Tess Engineering is a consolidated subsidiary of the Company.
Launch dateJune 2027 (scheduled delivery)
Applicable areaStabilization of power grids made unstable by the expansion of renewable energy power generation facilities and other factors
LocationNogata, Fukuoka Prefecture
Location scalePCS output: 2,556 kW; capacity: 8,944 kWh (2 HUAWEI units rated at 4,472 kW each)
Items this document does not state (10)
Contract ValueOffering priceContract DateAward/certification nameAwarding / certifying bodyRegistration number and expiry dateQuantitative EffectsUsage historyImpact on Business PerformanceSource

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

The order was secured through an ongoing relationship with 高沢産業株式会社, which began when Tess Engineering delivered solar power generation equipment to the company in 2014 and continued through the provision of maintenance and other services.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.
Corrections happenIf the company reissues this disclosure, the page is rebuilt from the corrected version and the revision number moves up.
We Received an Order from 高沢産業株式会社 for Construction Work to Install a Grid-Scale Battery Storage Facility | TESS Holdings Co.,Ltd. (5074) timely disclosure | Komori