Komori
Other Disclosures5074TESS Holdings Co.,Ltd.Construction and Materials

A tour of the Saga Imari Biomass Power Plant was held for second-year mechanical engineering students at Saga Prefectural Arita Technical High School

A tour was held at the Saga Imari Biomass Power Plant operated by a consolidated subsidiary for 36 high school students. The students were given an explanation of the power plant and how biomass power generation works, followed by a guided tour of the facility.

Worth reading
52Recurring
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Neutral
Direction inferred from the company’s description.
Scale
36
people
Wording
Definitive
How definitive the wording is.

Announced details

Saga Imari Biomass Power Plant; biomass power generation business
Applicable field (uses covered by this announcement)

Educational field trips; biomass power generation; qualifications required to operate a power plant

Launch date23 March 2026 (completed)
What the company reported numerically
Usage history

36 visitors (tour held on 23 March 2026)

Relationship between the counterparty and the company
TESS Holdings Co.,Ltd.5074
Relationship with the Company

The site of the educational field trip. No capital or personnel relationship is stated.

CounterpartySaga Prefectural Arita Technical High School

A high school located in Arita, Nishimatsuura District, Saga Prefecture. Second-year mechanical engineering students participated.

Location (as indicated in this announcement)

Imari, Saga Prefecture (the location of the head office of Imari Green Power Co., Ltd.; not explicitly stated as the location of this power plant)

In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.

Announced details
ItemDetails
Names of Products / Services CoveredSaga Imari Biomass Power Plant; biomass power generation business
CounterpartySaga Prefectural Arita Technical High School
Counterparty overviewA high school located in Arita, Nishimatsuura District, Saga Prefecture. Second-year mechanical engineering students participated.
Relationship with the CompanyThe site of the educational field trip. No capital or personnel relationship is stated.
Launch date23 March 2026 (completed)
Applicable areaEducational field trips; biomass power generation; qualifications required to operate a power plant
LocationImari, Saga Prefecture (the location of the head office of Imari Green Power Co., Ltd.; not explicitly stated as the location of this power plant)
Usage history36 visitors (tour held on 23 March 2026)
Items this document does not state (10)
Contract ValueOffering priceContract DateAward/certification nameAwarding / certifying bodyRegistration number and expiry dateLocation scaleQuantitative EffectsImpact on Business PerformanceSource

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

The tour was held as an educational field trip for Saga Prefectural Arita Technical High School.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.
Corrections happenIf the company reissues this disclosure, the page is rebuilt from the corrected version and the revision number moves up.
A tour of the Saga Imari Biomass Power Plant was held for second-year mechanical engineering students at Saga Prefectural Arita Technical High School | TESS Holdings Co.,Ltd. (5074) timely disclosure | Komori