Komori
ENEOS Holdings (5020) · InitiativeAchieved

Business Integration of JXエンジニアリング and 新興プランテック

First written in FY2019-Q2. 1 of 4 entries say "Advanced", first in FY2019-Q3. Latest entry: FY2020-Q1.

4entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2019-Q2AdvancedFY2019-Q3RestatedFY20192018: 120182019: 32019
Same theme, other companies
Business Integration of JXエンジニアリング and 新興プランテックA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

0 other companies' latest entry also says "Achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2020-Q1AchievedAnnual report

    「The transfer of the relevant assets and liabilities was completed in connection with the implementation of the above integration agreement on 1 July 2019.」

    The integration and transfer under the management integration agreement between JXエンジニアリング and 新興プランテック were completed on 1 July 2019.
  2. FY2019RestatedAnnual report

    「In December 2018, JXエンジニアリング株式会社 agreed to integrate its management with 新興プランテック株式会社 effective 1 July 2019.」

    The management integration agreement between the two companies and the effective date of 1 July 2019 remain unchanged, and preparations prior to completion are continuing.
  3. FY2019-Q3AdvancedAnnual report

    「“Business Integration Agreement” (parties to the agreement: the company, JX Engineering Co., Ltd. and Shin-Koh Planttech Co., Ltd.; date executed: 20 December 2018) The parties agreed to integrate the businesses of JX Engineering Co., Ltd. and Shin-Koh Planttech Co., Ltd. through an absorption-type merger effective 1 July 2019, with Shin-Koh Planttech Co., Ltd. as the surviving company and JX Engineering Co., Ltd. as the absorbed company.」

    The transaction progressed from the basic agreement reached in September 2018 to the execution of a management integration agreement on 20 December 2018, culminating in a specific agreement for an absorption-type merger effective 1 July 2019.
  4. FY2019-Q2First statedAnnual report

    「“Basic Agreement on Business Integration” (parties to the agreement: the company, JX Engineering Co., Ltd. and Shin-Koh Planttech Co., Ltd.; date executed: 28 September 2018) The agreement provided for JX Engineering Co., Ltd. and Shin-Koh Planttech Co., Ltd. to pursue business integration targeted for April 2019.」

    JX Engineering Co., Ltd. and Shin-Koh Planttech Co., Ltd. entered into a basic agreement to pursue business integration targeted for April 2019.
Moved together

"Strengthening competitiveness across the entire supply chain and pursuing thorough cost reductions" moved the same way as this thread, in the same document, in 2 of its 4 moves.

2★1
  1. ★This thread
  2. 1Strengthening competitiveness across the entire supply chain and pursuing thorough cost reductions2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for ENEOS Holdings yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.