Komori
Muromachi Chemicals (4885) · RiskRestated

Disaster and Operational Shutdown Risks from Concentration of Production Facilities in Fukuoka

First written in FY2021. 1 of 3 entries say "Mitigated", first in FY2022. Latest entry: FY2026.

3entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2021MitigatedFY20222021: 120212022: 120222023: 020232024: 020242025: 020252026: 12026
Same theme, other companies

The whole theme swung hardest in 2020: 21 of 74 companies on the "Worse" side.

51 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 100 companies compared. The sentences above are computed from all 100.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「Our production facilities are located in Fukuoka and Ibaraki prefectures, and we believe the likelihood of both sites being affected simultaneously by a natural disaster or other event is low. However, production facilities for pharmaceuticals and chemicals are concentrated in Fukuoka Prefecture, and not all of our plants can be immediately replaced. Consequently, in the event of a disaster, accident or other occurrence, damage to manufacturing equipment, suspension of production lines, compensation to business partners and residents near the plants, and other factors could affect our business, operating results and financial condition.」

    While indicating that the likelihood of both sites in Fukuoka and Ibaraki prefectures being affected simultaneously is low, it continues to disclose the risk arising from the concentration of pharmaceutical and chemical production in Fukuoka Prefecture.
  2. FY2022MitigatedAnnual report

    「Our production facilities are located in Fukuoka and Ibaraki prefectures, and we believe the likelihood of both sites being affected simultaneously by a natural disaster or other event is low.」

    While noting the concentration of production facilities in Fukuoka, it adds that the company has production facilities in two regions, Fukuoka and Ibaraki prefectures, making the likelihood of both sites being affected simultaneously low.
  3. FY2021First statedAnnual report

    「All production sites for pharmaceuticals, health foods and chemicals are concentrated in Fukuoka Prefecture, and none of our factories can be immediately replaced. Consequently, disasters or accidents may affect our business, operating results and financial position through damage to manufacturing equipment and other assets, production-line stoppages, and compensation to business partners and residents near our factories.」

    This indicates that production facilities for all businesses are concentrated in Fukuoka Prefecture, creating the possibility that plant operations and sales activities could be suspended in the event of a disaster, accident or infection outbreak.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Muromachi Chemicals yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Disaster and Operational Shutdown Risks from Concentration of Production Facilities in Fukuoka | MUROMACHI CHEMICALS INC. (4885) | Komori