Komori
Bml (4694) · RiskAdvanced

Risk of laboratory shutdown and testing disruption due to natural disasters

First written in FY2024. 1 of 3 entries say "Restated". Latest entry: FY2026.

3entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2024 – FY20252024: 120242025: 120252026: 12026
Same theme, other companies
Risk of Research and Development Facility and Activity Disruption Due to Natural Disasters and AccidentsA theme 11 companies write about · 11 as a headwind · 0 as a tailwind

0 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「For example, under scenarios assuming increasingly severe extreme weather, the company identified risks of lost sales opportunities, including flooding at critical sites and delays in or disposal of specimens due to supply chain disruptions. At the same time, it identified the opportunity that appropriate capital investment to strengthen site resilience from a business continuity planning perspective could differentiate the company from competitors and have a positive impact on sales opportunities.」

    Based on the 1.5–2°C and 4°C scenarios, the company identified the risk of delays in or disposal of specimens due to flooding and supply chain disruptions, as well as opportunities arising from investment in site resilience.
  2. FY2025RestatedAnnual report

    「There is a possibility that laboratories operated by the Group may be unable to conduct testing due to natural disasters such as earthquakes, storms and floods, tsunamis, and heavy snow. To prepare for such events, the company is implementing flood and earthquake countermeasures and resilience measures at the Central Research Institute in Kawagoe, Saitama Prefecture, its core laboratory. It is also developing a system under which the Central Research Institute can continue testing in the event of a disaster through coordination with each main laboratory.」

    The company continues measures to address the risk of laboratory shutdown due to natural disasters and to ensure testing continuity by strengthening the resilience of the Central Research Institute and coordinating with the main laboratories.
  3. FY2024First statedAnnual report

    「There is a possibility that laboratories operated by the Group may be unable to conduct testing due to natural disasters such as earthquakes, storms and floods, tsunamis, and heavy snow.」

    The risk that laboratories may be unable to conduct testing due to natural disasters was described independently for the first time as a major business risk. The disclosure also addresses strengthening the resilience of the Central Research Institute and establishing a system for continuing testing.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Bml's next results are scheduled for 2026-11-11. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.