Revised forecast
Fiscal year ending March 2027 · Second quarter (interim period)Previous forecast published 8 May 2026The bar length represents the relative magnitude of change, based on the item that changed the most in this document. The percentage change shown by the dotted line is calculated from the two reported figures because the company did not provide the rate.
The number of students and net sales were generally in line with plan. Utility costs were reduced through the conversion of school buildings to LED lighting, and maintenance and repair costs for school facilities and other expenses scheduled for the first half were deferred to the second half of the fiscal year, in some cases into the following fiscal year, following a review of procurement methods. As a result, operating expenses declined compared with the forecast.
Impairment loss of ¥45 million resulting from the decision to close one school building in Kanagawa Prefecture in order to optimize the location of school buildings
| Item | Details |
|---|---|
| Net Sales | ¥4,980 million → ¥4,999 million(0.4) |
| Operating profit | ¥-400 million → ¥-202 million |
| Ordinary income | ¥-395 million → ¥-199 million |
| Profit attributable to owners of the parent | ¥-420 million → ¥-285 million |
| Net income per share | -62.59 yen and sen → -42.59 yen and sen |
| Fiscal Period Covered | Fiscal year ending March 2027 |
| Period Covered | Second quarter (interim period) |
| Publication date of previous forecast | 8 May 2026 |
| Previous-period results | Second quarter (interim period) of the fiscal year ended March 2026: net sales of ¥4,887 million, operating loss of ¥241 million, ordinary loss of ¥240 million, interim net loss attributable to owners of the parent of ¥396 million, and interim net loss per share of ¥59.02 |
| Reason for the revision | The number of students and net sales were generally in line with plan. Utility costs were reduced through the conversion of school buildings to LED lighting, and maintenance and repair costs for school facilities and other expenses scheduled for the first half were deferred to the second half of the fiscal year, in some cases into the following fiscal year, following a review of procurement methods. As a result, operating expenses declined compared with the forecast. |
| Details and amount of extraordinary loss | Impairment loss of ¥45 million resulting from the decision to close one school building in Kanagawa Prefecture in order to optimize the location of school buildings |
| Consolidated / non-consolidated | Consolidated |
Items this document does not state (1)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.The number of students and net sales were generally in line with plan, while operating expenses came in below forecast because utility costs were reduced through the conversion of school buildings to LED lighting and costs for the maintenance and repair of school facilities and other items were deferred to the second half of the fiscal year, in some cases into the following fiscal year. In addition, an extraordinary loss of ¥45 million is to be recorded following the decision to close one school building in Kanagawa Prefecture.