Komori
Kawasaki Geological Engineering (4673) · FactDropped

Impact of COVID-19 on Construction Projects Under Way Limited at Present

First written in FY2020-Q2. 12 of 14 entries say "Restated". Latest entry: FY2024.

14entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2020-Q2 – FY20242020: 220202021: 420212022: 420222023: 320232024: 020242025: 1
Same theme, other companies
Suspension or Postponement of Construction Work and Production Activities Due to COVID-19A theme 24 companies write about · 24 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2024: 6 of 14 companies on the "Worse" side.

4 other companies' latest entry also says "Dropped".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 24 companies compared. The sentences above are computed from all 24.
Full recordFilings, disclosures and news, newest first
  1. FY2024DroppedAnnual report

    「(1) Trends in public-sector projects Because the company conducts a high proportion of its transactions with the public sector, including government agencies and public corporations, its operating performance may be affected by trends in public investment.」

    The statement included through the previous quarter that the company has limited exposure to COVID-19 and that there had been no interruptions to projects under construction could not be found in this filing.
  2. FY2023-Q3RestatedAnnual report

    「The group primarily provides geological and soil surveys related to construction work, as well as environmental, disaster prevention and marine survey services, and its principal businesses include related surveying, construction planning, design and construction work. Given the nature of its business, it has limited exposure to matters generally considered likely to be affected by COVID-19, such as crowded workplaces, and there have been no interruptions to projects under construction at this time.」

    The company has reaffirmed that, even after consolidation, it operates a business with limited exposure to COVID-19 and that the situation remains unchanged, with no interruptions to projects under construction at this time.
  3. FY2023-Q2RestatedAnnual report

    「The group primarily provides geological and soil surveys related to construction work, as well as environmental, disaster prevention and marine survey services, and its principal businesses include related surveying, construction planning, design and construction work. Given the nature of its business, it has limited exposure to matters generally considered likely to be affected by COVID-19, such as crowded workplaces, and there have been no interruptions to projects under construction at this time.」

    The company has reaffirmed that, even after consolidation, it operates a business with limited exposure to COVID-19 and that there have been no interruptions to projects under construction at this time.
  4. FY2023-Q1RestatedAnnual report

    「The group primarily provides geological and soil surveys related to construction work, as well as environmental, disaster prevention and marine survey services, and its principal businesses include related surveying, construction planning, design and construction work. Given the nature of its business, it has limited exposure to matters generally considered likely to be affected by COVID-19, such as crowded workplaces, and there have been no interruptions to projects under construction at this time.」

    The company has reaffirmed that, even after consolidation, it operates a business with limited exposure to COVID-19 and that there have been no interruptions to projects under construction.
  5. FY2022-Q3RestatedAnnual report

    「The company primarily provides geological and soil surveys related to construction work, as well as environmental, disaster prevention and marine survey services, and its principal businesses include related surveying, construction planning, design and construction work. Given the nature of its business, it has limited exposure to matters generally considered likely to be affected by COVID-19, such as crowded workplaces, and there have been no interruptions to projects under construction at this time.」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the end of the third quarter.
  6. FY2022-Q2RestatedAnnual report

    「Given the nature of its business, the company has limited exposure to matters generally considered likely to be affected by COVID-19, and there have been no interruptions to projects under construction at this time.」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the end of the second quarter.
  7. FY2022-Q1RestatedAnnual report

    「The company primarily provides geological and soil surveys related to construction work, as well as environmental, disaster prevention and marine survey services, and its principal businesses include related surveying, construction planning, design and construction work. Given the nature of its business, it has limited exposure to matters generally considered likely to be affected by COVID-19, such as crowded workplaces, and there have been no interruptions to projects under construction at this time.」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the end of the first quarter.
  8. FY2021RestatedAnnual report

    「Given the nature of its business, the company has limited exposure to matters generally considered likely to be affected by COVID-19, and although there have been no interruptions to projects under construction at this time,」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the end of the fiscal year.
  9. FY2021-Q3RestatedAnnual report

    「The company primarily provides geological and soil surveys related to construction work, as well as environmental, disaster prevention and marine survey services, and its principal businesses include related surveying, construction planning, design and construction work. Given the nature of its business, it has limited exposure to matters generally considered likely to be affected by COVID-19, such as crowded workplaces, and there have been no interruptions to projects under construction at this time.」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the end of the third quarter.
  10. FY2021-Q2RestatedAnnual report

    「Given the nature of its business, the company has limited exposure to matters generally considered likely to be affected by COVID-19, and there have been no interruptions to projects under construction at this time.」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the end of the second quarter.
  11. FY2021-Q1RestatedAnnual report

    「Given the nature of its business, the Company operates in a field with limited exposure to matters generally considered likely to be affected by COVID-19, such as crowding, and there have been no interruptions to projects currently under construction as of the present time.」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the end of the first quarter.
  12. FY2020RestatedAnnual report

    「Given the nature of its business, the company has limited exposure to matters generally considered likely to be affected by COVID-19, and there have been no interruptions to projects under construction at this time. Nevertheless, under a policy that prioritizes the safety of employees and other stakeholders above all else, the company recommends working from home, staggered commuting and other measures, and has established and implemented an appropriate management system for prevention and containment of the spread.」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the end of the fiscal year.
  13. FY2020-Q3RestatedAnnual report

    「Given the nature of its business, the company has limited exposure to matters generally considered likely to be affected by COVID-19, and there have been no interruptions to projects under construction at this time.」

    The company operates a business with limited exposure to COVID-19, and has reaffirmed that there have been no interruptions to projects under construction as of the current quarter.
  14. FY2020-Q2First statedAnnual report

    「Given the nature of its business, the company has limited exposure to matters generally considered likely to be affected by COVID-19, and there have been no interruptions to projects under construction at this time.」

    The company operates a business with limited exposure to COVID-19, and has recorded for the first time that there have been no interruptions to projects under construction as of the current quarter.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Kawasaki Geological Engineering yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Impact of COVID-19 on Construction Projects Under Way Limited at Present | Kawasaki Geological Engineering Co.,Ltd. (4673) | Komori