Komori
Environmental Control Center (4657) · InitiativeRestated

Opening of the Fukushima Hamadori Innovation Center

First written in FY2018. 4 of 6 entries say "Restated". Latest entry: FY2022.

6entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAchievedFY2019-Q1RestatedFY2019 – FY20222018: 220182019: 120192020: 020202021: 220212022: 12022
Same theme, other companies
Opening and operation of the Fukushima Hamadori Innovation CenterA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2022RestatedAnnual report

    「We have maintained the Fukushima Hamadori Innovation Center and advanced our response to the accident at Tokyo Electric Power Company Holdings' Fukushima Daiichi Nuclear Power Station, and have established a system for tritium analysis in connection with the discharge of treated water into the ocean.」

    Reconfirms the continued operation of the Fukushima Hamadori Innovation Center as a base for responding to the Fukushima Daiichi nuclear accident.
  2. FY2021RestatedAnnual report

    「We have maintained the Fukushima Hamadori Innovation Center and advanced our response to the accident at Fukushima Daiichi Nuclear Power Station, and have proceeded to establish a system for tritium analysis in connection with the discharge of treated water into the ocean.」

    Reconfirms the continued operation of the Fukushima Hamadori Innovation Center as a base for responding to the Fukushima Daiichi nuclear accident.
  3. FY2021-Q3RestatedAnnual report

    「We have maintained the Fukushima Hamadori Innovation Center as a base for responding to the accident at Fukushima Daiichi Nuclear Power Station, and will newly establish a system for tritium analysis in connection with the discharge of treated water into the ocean.」

    Continues to position the Fukushima Hamadori Innovation Center as a base for responding to the Fukushima Daiichi nuclear accident. The new tritium analysis system will be recorded in a separate thread.
  4. FY2019RestatedAnnual report

    「Against this market backdrop, we opened the Fukushima Hamadori Innovation Center in the Hamadori region of Fukushima Prefecture in September 2018 as a hub for radioactivity measurement and consulting.」

    Reconfirms the track record of opening a radioactivity measurement and consulting hub in the Hamadori region of Fukushima Prefecture in September 2018.
  5. FY2019-Q1AchievedAnnual report

    「In August 2018, we opened the Fukushima Hamadori Innovation Center in the Hamadori region of Fukushima Prefecture as a hub for radioactivity measurement and consulting.」

    The plan to open the center in early September 2018 is stated as an actual opening in August 2018.
  6. FY2018First statedAnnual report

    「Against this market backdrop, we will open the Fukushima Hamadori Innovation Center in the Hamadori region of Fukushima Prefecture in early September 2018 as a hub for radioactivity measurement and consulting, while strengthening operations serving as growth engines, including consulting on government policy, development-related assessments, asbestos, contract testing and environmental remediation construction.」

    Sets out a plan to open a radioactivity measurement and consulting hub in the Hamadori region of Fukushima Prefecture in early September 2018.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Environmental Control Center yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Opening of the Fukushima Hamadori Innovation Center | ENVIRONMENTAL CONTROL CENTER CO.,LTD. (4657) | Komori