Limited Spillover of Demand Amid Higher Construction Costs Due to Tight Labor and Material Supplies

First written in FY2017-Q1. 2 of 4 entries say "Dropped", first in FY2017. Latest entry: FY2019.

4entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017-Q1 – FY2017ReframedFY2018-Q32016: 120162017: 120172018: 120182019: 12019
Same theme, other companies

The whole theme swung hardest in 2022: 28 of 41 companies on the "Worse" side.

0 other companies' latest entry also says "Dropped".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 50 companies compared. The sentences above are computed from all 50.
Full recordFilings, disclosures and news, newest first
  1. FY2019DroppedAnnual report
    This filing does not mention the limited spillover of demand caused by labor and material shortages and rising construction costs related to the Tokyo Olympic and Paralympic Games, as described previously.
  2. FY2018-Q3ReframedAnnual report

    「Urban redevelopment projects ahead of the 2020 Tokyo Olympic and Paralympic Games have moved from the land acquisition phase, including soil contamination countermeasures, and the demolition of existing buildings, including asbestos countermeasures, to the building construction phase, where our services are required less frequently. As a result, the order environment has deteriorated more than initially anticipated at the beginning of the fiscal year.」

    The explanation of demand related to the Tokyo Olympic and Paralympic Games has changed from limited spillover due to labor and material shortages to reduced demand for our services as redevelopment projects have moved into a different phase.
  3. FY2017DroppedAnnual report
    This filing does not mention the labor and material shortages or construction cost inflation associated with the Tokyo Olympic and Paralympic Games described previously.
  4. FY2017-Q1First statedAnnual report

    「In the Tokyo metropolitan area, construction demand in central Tokyo is strong ahead of the 2020 Tokyo Olympic and Paralympic Games, but construction costs have risen sharply because of shortages of labor and materials, limiting the spillover effects.」

    Construction demand is strong, but labor and material shortages and rising construction costs are limiting the spillover effects.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Environmental Control Center yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Limited Spillover of Demand Amid Higher Construction Costs Due to Tight Labor and Material Supplies | ENVIRONMENTAL CONTROL CENTER CO.,LTD. (4657) | Komori