Who is moving to which position
It was determined that further collaboration should be strengthened, with function-based reporting lines as the primary structure and the separation between headquarters eliminated.
Abolish the Shimookui Plant as a headquarters; transfer the Active Pharmaceutical Ingredient Manufacturing Department and Production Management Department to the Production Headquarters, transfer the Quality Assurance Department and Quality Control Department to the Reliability Assurance Headquarters, and integrate the Environment and Safety Department into the Environment and Safety Office. Establish the Production Management Oversight Division, Quality Assurance Oversight Division, Quality Control Oversight Division and Engineering Office under the Production Headquarters.
| Item | Details |
|---|---|
| Reason for change | It was determined that further collaboration should be strengthened, with function-based reporting lines as the primary structure and the separation between headquarters eliminated. |
| Details of organizational changes | Abolish the Shimookui Plant as a headquarters; transfer the Active Pharmaceutical Ingredient Manufacturing Department and Production Management Department to the Production Headquarters, transfer the Quality Assurance Department and Quality Control Department to the Reliability Assurance Headquarters, and integrate the Environment and Safety Department into the Environment and Safety Office. Establish the Production Management Oversight Division, Quality Assurance Oversight Division, Quality Control Oversight Division and Engineering Office under the Production Headquarters. |
Items this document does not state (19)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.Following the absorption-type merger with 大和薬品工業, it was determined that further collaboration, including eliminating the separation between headquarters and primarily adopting function-based reporting lines, is necessary to achieve a true "ONE Daito."