Komori
Science Arts (4412) · RiskRestated

System Failures and Service Interruptions

First written in FY2021. 3 of 5 entries say "Restated". Latest entry: FY2025.

5entries
5years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2021WorsenedFY2022RestatedFY2023 – FY20252021: 12022: 120222023: 120232024: 120242025: 12025
Same theme, other companies
System Disruption Risk for Our Own ServicesA theme 16 companies write about · 16 as a headwind · 0 as a tailwind

The whole theme swung hardest in 2022: 1 of 7 companies on the "Worse" side.

13 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 16 companies compared. The sentences above are computed from all 16.
Full recordFilings, disclosures and news, newest first
  1. FY2025RestatedAnnual report

    「To ensure stable service operations, the company is strengthening server and other equipment capacity, adopting a multi-region architecture, building a computer-system backup framework, and strengthening its internal operating framework. However, if a large-scale system failure occurs due to currently unforeseeable factors, such as increased load resulting from a sudden surge in access, unexpected problems caused by natural disasters such as earthquakes or by accidents, computer viruses, power outages, communication failures, or prolonged interruption or suspension of services attributable to telecommunications carriers, the company's business and operating results may be affected.」

    The company continues to address the risk of system failures and service interruptions through measures including increased server capacity, a multi-region architecture, and backups.
  2. FY2024RestatedAnnual report

    「To ensure stable service operations, the company is strengthening server and other equipment capacity, adopting a multi-region architecture, building a computer-system backup framework, and strengthening its internal operating framework. However, if a large-scale system failure occurs due to currently unforeseeable factors, such as increased load resulting from a sudden surge in access, unexpected problems caused by natural disasters such as earthquakes or by accidents, computer viruses, power outages, communication failures, or prolonged interruption or suspension of services attributable to telecommunications carriers, the company's business and operating results may be affected.」

    The company continues to address the risk of system failures and service interruptions by strengthening server capacity, adopting a multi-region architecture, maintaining backups, and strengthening its internal operating framework.
  3. FY2023RestatedAnnual report

    「To ensure stable service operations, the company is strengthening server and other equipment capacity, adopting a multi-region architecture, building a computer-system backup framework, and strengthening its internal operating framework. However, if a large-scale system failure occurs due to currently unforeseeable factors, such as increased load resulting from a sudden surge in access, unexpected problems caused by natural disasters such as earthquakes or by accidents, computer viruses, power outages, communication failures, or prolonged interruption or suspension of services attributable to telecommunications carriers, the company's business and operating results may be affected.」

    The company continues to address the risk of system failures and service interruptions by strengthening server capacity, adopting a multi-region architecture, maintaining backups, and strengthening its internal operating framework.
  4. FY2022WorsenedAnnual report

    「The company also manages order data, billing data, and other information through its internal systems. …If these internal-system data were affected in any way, including as a result of a system failure, financial reporting could also be affected.」

    In addition to the existing risk of service interruptions, the company explicitly states that failures in internal systems could affect order and billing data and financial reporting, thereby expanding the scope of the risk.
  5. FY2021First statedAnnual report

    「If a large-scale system failure occurs due to currently unforeseeable factors, such as increased load resulting from a sudden surge in access, unexpected problems caused by natural disasters such as earthquakes or by accidents, computer viruses, power outages, communication failures, or prolonged interruption or suspension of services attributable to telecommunications carriers, the company's business and operating results may be affected.」

    The company's measures include strengthening server capacity, adopting a multi-region architecture, maintaining backups, and strengthening its internal operating framework.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Science Arts's next results are scheduled for 2026-10-15. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
System Failures and Service Interruptions | Science Arts,Inc. (4412) | Komori