Daicel (4202) · RiskMitigated

Product quality defects and product liability risks

First written in FY2016. 3 of 7 entries say "Materialised", first in FY2017. Latest entry: FY2025.

7entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY20192016: 120162017: 220172018: 220182019: 120192020: 020202021: 020212022: 020222023: 020232024: 020242025: 12025
Same theme, other companies
Product and Sold-Product Quality Defect, Quality Assurance and Product Liability RiskA theme 648 companies write about · 673 as a headwind · 2 as a tailwind

Daicel moved to the "Worse" side of this theme in 2017, 6 years before the typical company in this theme (2023).

15 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 194 companies compared. The sentences above are computed from all 194.Comparing 200 of the theme's 673 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2025MitigatedAnnual report

    「Regarding the discovery in 2022 of inappropriate conduct concerning UL certification by a U.S. third-party safety science organization for some resin products sold by our group company Daicel Miraizu Ltd., we have confirmed that no similar inappropriate quality-related conduct is currently taking place within our group and have completed measures to prevent recurrence.」

    Regarding inappropriate conduct related to UL certification, the company states that it confirmed there was no similar conduct within the group and completed measures to prevent recurrence.
  2. FY2019RestatedAnnual report

    「Our group has established a product quality assurance system and works to ensure product safety and prevent defective products from reaching the market. We also maintain liability insurance in preparation for any contingency.」

    The company continues to respond through product quality assurance, product safety measures, prevention of defective products reaching the market, and liability insurance.
  3. FY2018MaterialisedAnnual report

    「This relates to compensation losses arising from product quality defects.」

    The company recorded ¥85 million in compensation losses related to product quality defects as an extraordinary loss, indicating that quality risk has materialized in annual results.
  4. FY2018-Q3RestatedAnnual report

    「This relates to compensation losses arising from product quality defects.」

    The company recorded ¥85 million in compensation losses related to product quality defects and continues to disclose actual instances of quality risk.
  5. FY2018-Q2MaterialisedAnnual report

    「This relates to compensation losses arising from product quality defects.」

    The company recorded ¥85 million in compensation losses related to product quality defects as an extraordinary loss for the cumulative second-quarter period under review.
  6. FY2017MaterialisedAnnual report

    「This relates to compensation losses arising from product quality defects.」

    The company also recorded ¥989 million in claim compensation expenses related to product quality defects as an extraordinary loss during the year, indicating that quality risk has materialized as an actual loss.
  7. FY2016First statedAnnual report

    「This relates to compensation losses arising from product quality defects at a consolidated subsidiary in Thailand.」

    While quality assurance and product liability are described as general risks, compensation losses of ¥1,557 million arose during the fiscal year in connection with quality defects at a subsidiary in Thailand.
Moved together

"Risk of soaring prices for other raw materials and fuels" moved the same way as this thread, in the same document, in 2 of its 7 moves.

2222★1234
  1. ★This thread
  2. 1Risk of soaring prices for other raw materials and fuels2×
  3. 2Risk of sharp market fluctuations2×
  4. 3Industrial accident risks, including fires and explosions2×
  5. 4Expected additional tax payment related to transfer pricing rules2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Daicel's next results are scheduled for 2026-11-05. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.