Concentration at the Head Office Plant and Disaster and Accident Risks

First written in FY2017. 1 of 6 entries say "Worsened", first in FY2018. Latest entry: FY2024.

6entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017WorsenedFY2018OtherFY2019 – FY20232017: 12018: 120182019: 120192020: 020202021: 120212022: 020222023: 120232024: 12024
Same theme, other companies
Risk of Production Concentration at a Single Manufacturing SiteA theme 33 companies write about · 33 as a headwind · 0 as a tailwind

Osaka Yuka Industry moved to the "Worse" side of this theme in 2024, 2 years before the typical company in this theme (2026).

The whole theme swung hardest in 2020: 6 of 22 companies on the "Worse" side.

2 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 33 companies compared. The sentences above are computed from all 33.
Full recordFilings, disclosures and news, newest first
  1. FY2024MaterialisedAnnual report

    「Number of occupational accidents 2 0」

    While the company continues to disclose the concentration of operations at the Hirakata Plant, disaster and accident risks, and safety measures, the number of occupational accidents was 2 in fiscal 2023, exceeding the target of 0. The number of fatal occupational accidents was 0.
  2. FY2023Disclosure of zero occupational accidentsAnnual report

    「Number of occupational accidents 0 0 Number of fatal occupational accidents 0 0」

    While the company continues to disclose the concentration of operations at the Hirakata Plant and disaster and accident risks, it reported 0 occupational accidents and 0 fatal occupational accidents in fiscal 2022, with a target of 0 for both.
  3. FY2021RestatedAnnual report

    「The company uses the Hirakata Plant as its sole production site. It has obtained ISO45001 certification and formulated a BCP (business continuity plan), conducted disaster preparedness drills and implemented earthquake-resistance measures. However, a large-scale disaster such as an earthquake or fire at this site could affect the Group’s operating results and financial condition. The company also conducts ongoing improvement activities and regular training to prevent occupational accidents, but an unforeseen accident could affect the Group’s operating results and financial condition.」

    The company continues to address the concentration of production at the Hirakata Plant, disaster, occupational accident and unforeseen accident risks, as well as ISO45001, its BCP and disaster preparedness drills.
  4. FY2019Addition of safety management measures through ISO45001 certificationAnnual report

    「The company has obtained ISO45001 certification and formulated a BCP (business continuity plan), conducted disaster preparedness drills and implemented earthquake-resistance measures. However, a large-scale disaster such as an earthquake or fire at this site could affect the company’s operating results and financial condition.」

    The concentration of operations at the Hirakata Plant and the risks of disasters, occupational accidents and unforeseen accidents continue. The company newly discloses that it obtained ISO45001 certification in March 2019.
  5. FY2018WorsenedAnnual report

    「The company operates solely from its head office plant. Although it has formulated a BCP (business continuity plan) and conducts disaster preparedness drills and earthquake-resistance measures, a large-scale disaster such as an earthquake or fire at this site could affect the company’s operating results and financial condition. The company also conducts ongoing improvement activities and regular training to prevent occupational accidents, but an unforeseen accident could affect its operating results and financial condition.」

    In addition to the disaster risk at a single site, the company explicitly identifies the possibility of occupational accidents and unforeseen accidents, broadening the scope of the risks covered.
  6. FY2017First statedAnnual report

    「The company operates solely from its head office plant. Although it has formulated a BCP (business continuity plan) and conducts disaster preparedness drills and earthquake-resistance measures, a large-scale disaster such as an earthquake or fire at this site could affect the company’s operating results and financial condition.」

    The company identifies concentration at a single site as a structural risk and implements a BCP, disaster preparedness drills and earthquake-resistance measures.
Moved together

"Risk of Dependence on Specific Customers" moved the same way as this thread, in the same document, in 2 of its 6 moves.

2★1
  1. ★This thread
  2. 1Risk of Dependence on Specific Customers2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Osaka Yuka Industry's next results are scheduled for 2026-11-13. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.