Komori
Nihon Kagaku Sangyo (4094) · RiskWorsened

Uncertainty around Contract Processing of Secondary-Battery Cathode Materials Due to Slower Growth in Global EV Sales

First written in FY2026-H1. 2 of 4 entries say "Worsened", first in 2026-05-14. Latest entry: FY2026.

4entries
2years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2026-H1Worsened2026-05-14 – FY20262025: 120252026: 32026
Same theme, other companies

No other company in this theme has enough history to compare yet.

Moved together

"Full-Scale Operation and Increased Production of Contract Processing for Secondary-Battery Cathode Materials at the Fukushima No. 1 Plant" moved the same way as this thread, in the same document, in 3 of its 4 moves.

322★123
  1. ★This thread
  2. 1Full-Scale Operation and Increased Production of Contract Processing for Secondary-Battery Cathode Materials at the Fukushima No. 1 Plant3×
  3. 2External-Environment Risks from a Stronger Yen, Falling Share Prices, Weak Personal Consumption and a Slowdown in the Chinese Economy2×
  4. 3Financial Structure with a High Equity Ratio2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Nihon Kagaku Sangyo's next results are scheduled for 2026-11-09. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-06-02: "Materialised".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.