Komori
Nihon Kagaku Sangyo (4094) · InitiativeAdvanced

Implementing and Embedding a BCP Based on Lessons from the Great East Japan Earthquake and the Thai Floods

First written in FY2017-Q1. 23 of 26 entries say "Restated". Latest entry: 2026-06-02.

26entries
11years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017-Q1 – FY2024-Q32016: 220162017: 420172018: 420182019: 320192020: 320202021: 220212022: 320222023: 220232024: 120242025: 120252026: 12026
Same theme, other companies
Emergency Response Framework Based on a Business Continuity Plan (BCP)A theme 314 companies write about · 75 as a headwind · 243 as a tailwind

The whole theme swung hardest in 2020: 22 of 113 companies on the "Worse" side.

56 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 195 companies compared. The sentences above are computed from all 195.Comparing 200 of the theme's 319 threads.
Full recordFilings, disclosures and news, newest first
  1. 2026-06-02AdvancedGeneral Meetings of Shareholders

    「During the fiscal year under review, we conducted a company-wide review of our Business Continuity Plan (BCP) and strengthened measures based on risk analysis.」

    The disclosure reported a company-wide review and strengthening of measures under the BCP, incorporating lessons from the Great East Japan Earthquake and the flooding in Thailand.
  2. FY2025AdvancedAnnual report

    「具体的には拠点ごとの対応マニュアルを定期的に見直すことや、被災した拠点を早期復旧させた経験を踏まえ部材のストックを行うこと等で対応しております。」

    Specific measures were outlined for implementing the BCP based on lessons from the Great East Japan Earthquake and the Thailand floods, including reviewing the manuals and stocking components.
  3. FY2024-Q3RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  4. FY2024-Q2RestatedAnnual report

    「To respond accurately and promptly as a group to changing risks in the business environment, natural disasters and other areas, we will embed and implement a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, while」

    The policy of embedding and implementing a BCP based on lessons from earthquakes and floods continues.
  5. FY2023-Q3RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a resilient business structure and earnings capacity, continue.
  6. FY2023-Q2RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The policy of embedding and implementing a BCP based on lessons from earthquakes and floods, and building a resilient business structure and earnings capacity, continues.
  7. FY2023-Q1RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a resilient business structure and earnings capacity, continue.
  8. FY2022-Q3RestatedAnnual report

    「As a group, to respond accurately and promptly to changing risks in the business environment, natural disasters and other areas, we will embed and implement a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, while building an even more resilient business structure and earnings capacity」

    The policy of embedding and implementing a BCP based on lessons from earthquakes and floods, and building a resilient business structure and earnings capacity, continues.
  9. FY2022-Q1RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  10. FY2021RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  11. FY2021-Q2RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  12. FY2021-Q1RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  13. FY2020-Q3RestatedAnnual report

    「To respond accurately and promptly as a group to changing risks in the business environment, natural disasters and other areas, we will embed and implement a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, while」

    The policy of embedding and implementing a BCP based on lessons from earthquakes and floods continues.
  14. FY2020-Q2RestatedAnnual report

    「To respond accurately and promptly as a group to changing risks in the business environment, natural disasters and other areas, we will embed and implement a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, while building an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a resilient business structure and earnings capacity, continue.
  15. FY2020-Q1RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  16. FY2019-Q3RestatedAnnual report

    「To respond accurately and promptly as a group to changing risks in the business environment, natural disasters and other areas, we will embed and implement a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, while building an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  17. FY2019-Q2RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  18. FY2019-Q1RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  19. FY2018RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  20. FY2018-Q3RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  21. FY2018-Q2RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  22. FY2018-Q1RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  23. FY2017RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  24. FY2017-Q3RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  25. FY2017-Q2RestatedAnnual report

    「While embedding and implementing a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the Thailand floods, we will build an even more resilient business structure and earnings capacity,」

    The embedding and implementation of a BCP based on lessons from earthquakes and floods, and the building of a more resilient business structure, continue.
  26. FY2017-Q1First statedAnnual report

    「We will embed and implement a business continuity plan (BCP) based on the lessons learned from the Great East Japan Earthquake and the floods in Thailand, while building a more resilient business structure and earnings capacity.」

    The company is working to embed and implement a BCP based on lessons from past earthquakes and floods and to build a more resilient business structure and earnings capacity.
Moved together

"Full-Scale Operation and Increased Production of Contract Processing for Secondary-Battery Cathode Materials at the Fukushima No. 1 Plant" moved the same way as this thread, in the same document, in 2 of its 26 moves.

22★12
  1. ★This thread
  2. 1Full-Scale Operation and Increased Production of Contract Processing for Secondary-Battery Cathode Materials at the Fukushima No. 1 Plant2×
  3. 2Business Continuity Risks from Changes in the Operating Environment and Natural Disasters2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Nihon Kagaku Sangyo's next results are scheduled for 2026-11-09. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-06-02: "Advanced".