Komori
Tomoku (3946) · RiskRestated

Serious Accident Risks in Transportation and Housing Construction Sites

First written in FY2024. 1 of 2 entries say "Restated". Latest entry: FY2026.

2entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2024 – FY20262024: 120242025: 020252026: 12026
Same theme, other companies
Risk of liability and reputational damage from serious accidentsA theme 4 companies write about · 4 as a headwind · 0 as a tailwind

3 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「The Group conducts safety inspections, introduces vehicles equipped with the latest safety features and other measures, develops and enhances training facilities and programs, provides training using driving simulators, reduces the number of work hours at residential construction sites through the precutting of structural components, and carries out regular site inspections and safety patrols. The Group also works to foster a culture that prioritizes safety and endeavors to minimize these risks.」

    The company continues to implement measures addressing the risk of serious accidents at transportation and residential construction sites, including vehicles equipped with safety features, training, driving simulators, and construction-site inspections and patrols.
  2. FY2024First statedAnnual report

    「If a serious accidental incident occurs in the transportation business, at a residential construction site or elsewhere, it could affect the operating results and other aspects of the Group's performance through a decline in social credibility, compensation and indemnification risks, and brand damage.」

    The company has, for the first time, identified declines in credibility, compensation and indemnification, and brand damage resulting from serious accidents in the transportation business and at residential construction sites as independent risks. Measures described include safety inspections, vehicles equipped with safety features, training, driving simulators, and inspections and patrols at construction sites.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
Tomoku's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Serious Accident Risks in Transportation and Housing Construction Sites | TOMOKU CO.,LTD. (3946) | Komori