- FY2026AdvancedAnnual report
「In January 2026, the fuel conversion at our Kanazu Plant from coal to LNG was completed, and emissions in fiscal 2025 were reduced by 17% compared with fiscal 2013. Going forward, we will continue to pursue thorough energy conservation toward achieving our fiscal 2030 target, while promoting fuel conversion for coal and heavy-oil boilers, the installation of new biomass boilers, and the introduction of renewable energy facilities such as solar power generation.」
The fuel conversion at the Kanazu Plant from coal to LNG was completed in January 2026, and greenhouse gas emissions in fiscal 2025 were reduced by 17% compared with fiscal 2013. - FY2025AdvancedAnnual report
「In fiscal 2025, we will convert the fuel at our Kanazu Plant from coal to LNG. To achieve our fiscal 2030 target, we will pursue thorough energy conservation, convert coal- and heavy-oil-fired boilers to other fuels, install new biomass boilers and promote the introduction of renewable energy facilities such as solar power generation systems.」
The timing of the fuel conversion at the Kanazu Plant from coal to LNG is set for fiscal 2025, with boiler fuel conversion, a biomass boiler, and solar power generation identified as specific measures. - FY2024-Q2AdvancedAnnual report
「Environmental initiatives under ESG management are the highest-priority issue for our Group, which has adopted “Less is more.” as its keyword. Toward our fiscal 2030 target of reducing CO2 emissions by 46% from fiscal 2013 levels, we will convert the fuel used at the Kanazu Plant in 2026 and at Marusan Paper株式会社, based in Minamisoma, Fukushima Prefecture, in 2027, to LNG in order to eliminate coal use.」
The company presented a specific fuel conversion plan to eliminate coal use, converting the Kanazu Plant to LNG in 2026 and Marusan Paper to LNG in 2027. - FY2023AdvancedAnnual report
「Environmental initiatives under ESG management are the highest-priority issue for our Group, which has adopted “Less is more.” as its keyword. Toward our fiscal 2030 target of reducing CO2 emissions by 46% from fiscal 2013 levels (Eco Challenge 2030), we upgraded the biomass incineration facility at the Amagasaki Plant in August 2022 to reduce city gas consumption, and in October began operating a second biomass boiler for power generation at the Tonegawa Facility, following the one at the Yashio Plant.」
In addition to upgrading the biomass incineration facility at the Amagasaki Plant, the second biomass boiler for power generation began operating at the Tonegawa Facility, advancing power generation and fuel conversion initiatives. - FY2023-Q2AdvancedAnnual report
「Toward the fiscal 2030 target of reducing CO2 emissions by 46% from fiscal 2013 levels, a second biomass boiler for power generation, following the one at the Yashio Plant, began operating at the Tonegawa Facility in October 2022.」
The second biomass boiler for power generation, following the one at the Yashio Plant, began operating at the Tonegawa Facility, bringing investment in power generation facilities into the operational phase. - FY2020AdvancedAnnual report
「Reporting company: Tonegawa Facility (Bando, Ibaraki Prefecture); paperboard and paper processing-related business; new biomass boiler installation; 9,500; 346; internal funds; July 2019; October 2022」
As part of initiatives to improve resource efficiency and diversify energy sources, the company began installing a new biomass boiler at the Tonegawa Facility, with a planned investment of ¥9,500 million and scheduled completion in October 2022. - FY2016First statedAnnual report
「To promote efficient resource use and diversify energy sources, we newly installed a steam turbine power generation system at the Kanazu Plant in Awara, Fukui Prefecture, a wood-chip biomass power generation system at the Yashio Plant in Yashio, Saitama Prefecture, and a gas turbine power generation system at the Amagasaki Plant in Amagasaki, Hyogo Prefecture.」
We have newly installed multiple power generation systems, including steam, wood-chip biomass and gas turbine systems.