Reconstruction of the power generation facilities at Iwaki Daio Paper's main plant
First written in FY2024-Q2. 3 of 5 entries say "Advanced", first in FY2024-Q3. Latest entry: FY2026.
No other company in this theme has enough history to compare yet.
- FY2026AchievedAnnual report
「By restarting the biomass boiler at いわき大王製紙, which had been shut down since 2022, the plant became fully self-sufficient in power generated from biomass fuel, contributing to a lower environmental impact and improved profitability through reduced heavy fuel oil consumption.」
The restart of the biomass boiler at いわき大王製紙 enabled the plant to achieve 100% in-house power generation using biomass fuel. - FY2025AdvancedAnnual report
「いわき大王製紙株式会社 Head Office Plant (Iwaki, Fukushima Prefecture) Paper and Paperboard Reconstruction of power generation facilities 19,000 16,475 Borrowings, etc. November 2023 July 2025 Power generation capacity 33,333 kW」
For the reconstruction of the power generation facilities at いわき大王製紙, payments made to date increased from ¥4,332 million to ¥16,475 million, and the plan, with completion scheduled for July 2025, is progressing. - FY2024AdvancedAnnual report
「いわき大王製紙株式会社 Head Office Plant (Iwaki, Fukushima Prefecture) Paper and Paperboard Reconstruction of power generation facilities 19,000 4,332 Borrowings, etc. November 2023 July 2025 Power generation capacity 33,333 kW」
Under the reconstruction plan for the power generation facilities at いわき大王製紙, payments made to date increased from ¥2,936 million to ¥4,332 million. The plan remains in place, with completion scheduled for July 2025 and power generation capacity of 33,333 kW. - FY2024-Q3AdvancedAnnual report
「いわき大王製紙株式会社 Head Office Plant (Iwaki, Fukushima Prefecture) Paper and Paperboard Reconstruction of power generation facilities 19,000 2,936 Borrowings, etc. November 2023 July 2025 Power generation capacity 33,333 kW」
Following the commencement of work in November 2023 under the reconstruction plan for the power generation facilities at the いわき大王製紙 head office plant, payments made to date reached ¥2,936 million. The plan remains unchanged, with total investment of ¥19,000 million, completion scheduled for July 2025, and power generation capacity of 33,333 kW. - FY2024-Q2First statedAnnual report
「いわき大王製紙株式会社 Head Office Plant (Iwaki, Fukushima Prefecture) Paper and Paperboard Reconstruction of power generation facilities 19,000 - Borrowings, etc. November 2023 July 2025 Power generation capacity 33,333 kW」
A reconstruction plan for the power generation facilities at the いわき大王製紙 head office plant was newly finalized, with an investment of ¥19,000 million, work commencing in November 2023, completion scheduled for July 2025, and power generation capacity of 33,333 kW.