Komori
ODK Solutions Company (3839) · RiskRestatedLatest Occurring Fact (2026-04-30): "Materialised"

Quality Control Risk from System Failures and Human Error

First written in FY2020. 2 of 4 entries say "Restated". Latest entry: 2026-04-30.

4entries
7years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2020 – FY20232020: 120202021: 120212022: 020222023: 120232024: 020242025: 020252026: 12026
Same theme, other companies
Risk of Application and Software DefectsA theme 23 companies write about · 23 as a headwind · 0 as a tailwind

ODK Solutions Company moved to the "Worse" side of this theme in 2026, the same year as the typical company in this theme.

The whole theme swung hardest in 2026: 4 of 15 companies on the "Worse" side.

1 other company's latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 23 companies compared. The sentences above are computed from all 23.
Full recordFilings, disclosures and news, newest first
  1. 2026-04-30MaterialisedOccurring Fact

    「Some deliverables from a development contractor failed to meet requirements, and because improvement was not expected, we suspended part of the development work and changed the structure. As a result, we recorded a ¥47 million loss on disposal of property, plant and equipment.」

    Nonconforming deliverables from a development contractor led to the partial suspension of development and a change in the structure, resulting in a loss on disposal of property, plant and equipment.
  2. FY2023RestatedAnnual report

    「In addition to managing project schedules, conducting test reviews and preparing manuals, our Group requires corrective-action reports for defects and errors even when they do not lead to system failures, and implements more effective measures to ensure that recurrence is prevented.」

    Quality control and recurrence-prevention measures, including schedule management, test reviews, manual preparation and corrective-action reports, remain in place.
  3. FY2021RestatedAnnual report

    「In addition to managing project schedules, conducting test reviews and preparing manuals, our Group requires corrective-action reports for defects and errors even when they do not lead to system failures, and implements more effective measures to ensure that recurrence is prevented.」

    Quality control and recurrence-prevention measures, including schedule management, test reviews, manual preparation and corrective-action reports, remain in place.
  4. FY2020First statedAnnual report

    「We provide comprehensive information services, including the operation, development and maintenance of information systems. System failures and human error may result in service outages or delays.」

    Service outages and delays caused by system failures or human error, and the impact on financial results from recovery and repair costs, were listed independently as key risks for the first time.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
ODK Solutions Company's next results are scheduled for 2026-10-28. Read the earnings preview It last moved in the Occurring Fact of 2026-04-30: "Materialised".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Quality Control Risk from System Failures and Human Error | ODK Solutions Company,Ltd. (3839) | Komori