System Integrator Corp. (3826) · RiskMaterialised
Performance fluctuations caused by the concentration of acceptance dates for large projects
First written in FY2017-Q1. 1 of 1 entries say "Materialised", first in FY2017-Q1. Latest entry: FY2017-Q1.
1entries
1years
0from disclosures
How it moved
Same theme, other companies
Deterioration in business performance due to slippage in project acceptance timing and higher cost ratiosA theme 3 companies write about · 3 as a headwind · 0 as a tailwind
System Integrator Corp. moved to the "Worse" side of this theme in 2016.
0 other companies' latest entry also says "Materialised".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.