The target tracer-gas generation rate is 300 L per minute, approximately 5 times that of the current largest model, HT-67. The aim is to shorten the filling time for large-diameter water pipes.
株式会社グッドマン is a consolidated subsidiary of the Company.
株式会社グッドマン: Head office: 2-3-3 Mutsuurahigashi, Kanazawa-ku, Yokohama, Kanagawa Prefecture; established on 5 March 1988; representative: Representative Director Onuki Kimihiro (大貫 公寛). The company imports and sells measuring and locating equipment used for the inspection and maintenance of infrastructure such as electricity, telecommunications and water supply systems, and operates a water-leak detection equipment business.
The official sales price will be announced once determined.
The company does not address Contract Value / Impact on Business Performance.
| Item | Details |
|---|---|
| Names of Products / Services Covered | Large hydrogen tracer-gas generator “HT-300” |
| Counterparty overview | 株式会社グッドマン: Head office: 2-3-3 Mutsuurahigashi, Kanazawa-ku, Yokohama, Kanagawa Prefecture; established on 5 March 1988; representative: Representative Director Onuki Kimihiro (大貫 公寛). The company imports and sells measuring and locating equipment used for the inspection and maintenance of infrastructure such as electricity, telecommunications and water supply systems, and operates a water-leak detection equipment business. |
| Relationship with the Company | 株式会社グッドマン is a consolidated subsidiary of the Company. |
| Offering price | The official sales price will be announced once determined. |
| Launch date | February 2027 (earliest planned timing; scheduled start of sales) |
| Applicable area | Disaster Recovery, Water-leak investigations during large-scale disasters, Water supply business, Water supply construction, Investigation of sections connected to hospitals, dialysis facilities and evacuation shelters |
| Quantitative Effects | The target tracer-gas generation rate is 300 L per minute, approximately 5 times that of the current largest model, HT-67. The aim is to shorten the filling time for large-diameter water pipes. |
Items this document does not state (11)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.To shorten the filling time for large-diameter water pipes and enable investigations to begin sooner on sections connected to hospitals, dialysis facilities and evacuation shelters.