Operating Interruptions Caused by Fires and Disasters
First written in FY2016. 9 of 15 entries say "Materialised", first in FY2016. Latest entry: FY2023.
Tokushu Tokai Paper moved to the "Worse" side of this theme in 2016, 4 years before the typical company in this theme (2020).
The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.
33 other companies' latest entry also says "Materialised".
- FY2023MaterialisedAnnual report
「This represents restoration costs, fixed costs incurred during the suspension of operations, and other costs at the Group's hydroelectric power plant damaged by Typhoon No. 15 in September 2022.」
Damage to the hydroelectric power plant caused by Typhoon No. 15 was recognized as a disaster-related loss of ¥44 million, including restoration costs and fixed costs incurred during the suspension of operations. - FY2023-Q3MaterialisedAnnual report
「Due to the effects of Typhoon No. 15, which occurred in September 2022, a hydroelectric power plant owned by the Group was damaged and had been out of operation.」
The hydroelectric power plant was damaged by Typhoon No. 15, resulting in a suspension of operations, restoration costs and fixed costs incurred during the suspension. Additional information states that operations resumed in January 2023. - FY2023-Q2MaterialisedAnnual report
「Due to the effects of Typhoon No. 15, which occurred in September 2022, a hydroelectric power plant owned by the Group was damaged and is currently out of operation.」
The hydroelectric power plant was damaged by Typhoon No. 15 and operations were suspended. The impact of restoration costs and other factors is currently difficult to calculate reasonably. - FY2022RestatedAnnual report
「The Group performs regular preventive maintenance to minimize the potential adverse effects of unexpected interruptions to its production lines. It also provides education and training to minimize the effects of disasters, accidents and other unforeseen events. In particular, for earthquake preparedness, it has established an emergency response organization within the Group and will respond flexibly as circumstances require.」
The Group continues measures to address operating interruptions through preventive maintenance, education and training, and an emergency response organization. - FY2019-Q3MaterialisedAnnual report
「This resulted from wind and flood damage caused by Typhoon No. 24.」
Wind and flood damage caused by Typhoon No. 24 occurred, and a disaster-related loss of ¥97 million was recognized. - FY2019-Q2MaterialisedAnnual report
「This represents abnormal costs associated with reduced operations caused by damage to wastewater treatment equipment at a consolidated subsidiary, as well as restoration costs.」
Wastewater treatment equipment at a consolidated subsidiary was damaged, and an abnormal operating loss of ¥39 million was recognized as abnormal costs associated with reduced operations and restoration costs. - FY2018RestatedAnnual report
「The Group performs regular preventive maintenance to minimize the potential adverse effects of unexpected interruptions to its production lines. It also provides education and training to minimize the effects of infectious diseases, disasters, accidents and other unforeseen events. In particular, for earthquake preparedness, it has established an emergency response organization within the Group and will respond flexibly as circumstances require.」
The disclosure continues to describe measures involving preventive maintenance, education and training, and an emergency response organization, while stating that the risk of operating interruptions remains. - FY2018-Q3RestatedAnnual report
「This represents abnormal costs associated with reduced operations caused by damage to part of a boiler at the Shimada Plant, as well as restoration costs.」
The disclosure reiterates that an abnormal operating loss of ¥74 million was recognized for reduced operations and restoration costs associated with damage to part of a boiler at the Shimada Plant. - FY2018-Q2MaterialisedAnnual report
「This represents abnormal costs associated with reduced operations caused by damage to part of a boiler at the Shimada Plant, as well as restoration costs.」
An abnormal operating loss of ¥74 million was recognized in the six months ended the second quarter for reduced operations and restoration costs associated with damage to part of a boiler at the Shimada Plant. - FY2018-Q1MaterialisedAnnual report
「This represents abnormal costs associated with reduced operations caused by damage to part of a boiler at the Shimada Plant, as well as restoration costs.」
Part of a boiler at the Shimada Plant was damaged, and an abnormal cost of ¥47 million associated with reduced operations and restoration costs was recognized. - FY2017RestatedAnnual report
「However, there is no assurance that these effects can be completely prevented or mitigated. In addition, many of the Group's plants and facilities are located in Shizuoka Prefecture, and a major earthquake or other event that interrupts operations could affect the Group's operating results and financial position.」
The Group states that the risk of operating interruptions caused by disasters and accidents remains while it continues measures including preventive maintenance, education and training, and an earthquake response organization. - FY2017-Q3RestatedAnnual report
「This represents the loss resulting from the fire at the Shimada Plant in May 2016. It comprises losses from the destruction of fixed assets and other items, restoration costs, and fixed costs incurred during the suspension of operations.」
The disclosure reiterates the fire-related loss from the May 2016 fire at the Shimada Plant, including the destruction of fixed assets and other items, restoration costs, and fixed costs incurred during the suspension of operations. - FY2017-Q2RestatedAnnual report
「This represents the loss resulting from the fire at the Shimada Plant in May 2016. It comprises losses from the destruction of fixed assets and other items, restoration costs, and fixed costs incurred during the suspension of operations.」
The disclosure reiterates that a fire-related loss of ¥90 million was recognized for the May 2016 fire at the Shimada Plant, including the destruction of fixed assets and other items, restoration costs, and fixed costs incurred during the suspension of operations. - FY2017-Q1MaterialisedAnnual report
「This represents the loss resulting from the fire at the Shimada Plant in May 2016. It comprises losses from the destruction of fixed assets and other items, restoration costs, and fixed costs incurred during the suspension of operations.」
A new fire occurred at the Shimada Plant in May 2016, and a fire-related loss of ¥90 million was recognized. The loss included the destruction of fixed assets and other items, restoration costs, and fixed costs incurred during the suspension of operations. - FY2016MaterialisedAnnual report
「This represents abnormal costs associated with reduced operations at the chip silo resulting from a fire at the Group's Shimada Plant.」
The fire at the Shimada Plant resulted in an abnormal operating loss of ¥215 million in the current period. Measures including preventive maintenance, education and training, and an earthquake response organization are also described.