Tokushu Tokai Paper (3708) · InitiativeMitigated

Renovation of the Akamatsu Hydroelectric Power Plant and Its Contribution to Profit

First written in FY2016. 6 of 12 entries say "Mitigated", first in FY2021-Q1. Latest entry: FY2026.

12entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2016MitigatedFY2021-Q1MitigatedFY2023-Q3 – FY2024-Q32016: 120162017: 020172018: 020182019: 220192020: 220202021: 020212022: 120222023: 220232024: 220242025: 120252026: 12026
Same theme, other companies
Akamatsu Hydroelectric Power Plant renewal and monetization of electricity salesA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「Sales from electricity sales at the Akamatsu Hydroelectric Power Station exceeded those of the previous year due to the rebound from the impact of its shutdown caused by equipment trouble in the previous year.」

    Sales from electricity sales at the Akamatsu Hydroelectric Power Station exceeded those of the previous year due to the rebound from the impact of its shutdown caused by equipment trouble in the previous year.
  2. FY2026-H1MitigatedAnnual report

    「In addition, with regard to the Akamatsu Hydroelectric Power Station, which sells electricity, due in part to the rebound from the impact of its shutdown caused by equipment trouble in the previous year」

    The electricity sales business improved due to the rebound from the impact of the Akamatsu Hydroelectric Power Station's shutdown caused by equipment trouble in the previous year.
  3. FY2025-H1WorsenedAnnual report

    「In addition, sales and earnings from electricity sales fell below those of the previous year because operations at the Akamatsu Hydroelectric Power Station were suspended due to equipment trouble.」

    The Akamatsu Hydroelectric Power Station was shut down due to equipment trouble, causing sales and earnings from electricity sales to fall below those of the previous year.
  4. FY2024-Q3MitigatedAnnual report

    「In terms of earnings, the hydroelectric power sales business performed steadily, resulting in earnings exceeding those of the previous year, when operations at the Akamatsu Hydroelectric Power Station were suspended due to a typhoon.」

    The Akamatsu Hydroelectric Power Station had been shut down by a typhoon in the previous year, but the hydroelectric power sales business performed steadily and earnings exceeded those of the previous year.
  5. FY2024-Q2MitigatedAnnual report

    「In terms of earnings, the hydroelectric power sales business performed steadily, resulting in earnings exceeding those of the previous year.」

    The hydroelectric power sales business performed steadily, and earnings in the Industrial Materials segment exceeded those of the previous year.
  6. FY2023-Q3MitigatedAnnual report

    「The hydroelectric power station owned by the company was damaged by Typhoon No. 15, which occurred in September 2022, and had been shut down, but operations resumed in January 2023.」

    The hydroelectric power station that had been shut down by Typhoon No. 15 resumed operations in January 2023.
  7. FY2022WorsenedAnnual report

    「Meanwhile, in terms of earnings, the hydroelectric power sales business recorded a year-on-year decline in earnings due in part to the impact of drought conditions.」

    The hydroelectric power sales business recorded a year-on-year decline in earnings due in part to drought conditions, weakening its contribution to earnings.
  8. FY2021-Q1MitigatedAnnual report

    「In terms of earnings, operating profit was ¥255 million, up 93.5% year on year, due in part to the rebound from the impact of drought conditions on the hydroelectric power sales business in the previous fiscal year and the business's steady performance.」

    Operating profit in the Industrial Materials segment increased 93.5% year on year, driven by the rebound from the impact of drought conditions in the previous fiscal year and the steady performance of the hydroelectric power sales business.
  9. FY2020-Q3SoftenedAnnual report

    「In addition, the hydroelectric power sales business recorded a decline in earnings due to the impact of drought conditions」

    The decline in earnings in the hydroelectric power sales business due to drought conditions continues to be reported, although this filing describes it as a "decline in earnings," compared with the "significant decline in earnings" reported in the previous quarter.
  10. FY2020-Q2WorsenedAnnual report

    「In addition, the hydroelectric power sales business recorded a decline in earnings due to the impact of drought conditions」

    The impact of the significant decline in earnings caused by drought conditions on the hydroelectric power sales business continued through the six months ended the second quarter.
  11. FY2020-Q1WorsenedAnnual report

    「The hydroelectric power sales business recorded a significant decline in earnings due to drought conditions」

    It is reported that the power sales business, including the renewed hydroelectric power station, recorded a significant decline in earnings due to the impact of drought conditions.
  12. FY2016AdvancedAnnual report

    「Meanwhile, as part of our growth strategy, the Akamatsu Hydroelectric Power Station, whose renewal work was completed in February last year, contributed to earnings.」

    The contribution to earnings following completion of the renewal work is reported.
Moved together

"Lower profit in the hydroelectric power sales business due to drought" moved the same way as this thread, in the same document, in 8 of its 12 moves.

864432★123456
  1. ★This thread
  2. 1Lower profit in the hydroelectric power sales business due to drought8×
  3. 2Monetization of Environmental-Related Businesses6×
  4. 3Raw Material and Fuel Price Volatility4×
  5. 4Progress in Developing New Products Such as Airas4×
  6. 5Deterioration in 日本東海インダストリアルペーパーサプライ’s Performance and Equity-Method Investment Loss3×
  7. 6Effective Utilization of Company-Owned Forests by the Southern Alps Business Headquarters2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Tokushu Tokai Paper yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Renovation of the Akamatsu Hydroelectric Power Plant and Its Contribution to Profit | Tokushu Tokai Paper Co.,Ltd. (3708) | Komori