AltPlus Holdings (3672) · RiskMaterialised
Risk of Losses on Contract Development Projects
First written in FY2023. 1 of 2 entries say "Materialised", first in FY2024. Latest entry: FY2024.
2entries
2years
0from disclosures
How it moved
Same theme, other companies
Release of the Provision for Losses on Contracts Expected to Incur LossesA theme 148 companies write about · 147 as a headwind · 1 as a tailwind
AltPlus Holdings moved to the "Worse" side of this theme in 2024, 1 year after the typical company in this theme (2023).
6 other companies' latest entry also says "Materialised".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 148 companies compared. The sentences above are computed from all 148.Full recordFilings, disclosures and news, newest first
- FY2024MaterialisedAnnual report
「当連結会計年度末において将来の損失の発生が見込まれ、かつ、当該損失額を合理的に見積もることが可能なものについては、翌連結会計年度以降に発生が見込まれる損失額に対して、受注損失引当金を計上しております。」
受託開発案件について将来損失が見込まれる案件が発生し、受注損失引当金2,042千円を計上した。受注損失リスクが実際の会計処理として現れた。 - FY2023First statedAnnual report
「開発の遅れ、仕様の変更や人件費の高騰等により、当初の見積原価総額が大きく変動した場合は、進捗率の変更による収益の見積りが変更されます。また、見積原価総額が契約金額を超過する場合は、受注損失引当金を計上する必要がある」
受託開発について、開発遅延、仕様変更、人件費高騰により原価総額が契約金額を超過し、受注損失引当金の計上に至るリスクを独立して記載した。