Shortage of Store Sites, Construction Delays, and Failure to Meet Store Opening Plans

First written in FY2017. 6 of 10 entries say "Materialised", first in FY2025-H1. Latest entry: FY2026.

10entries
10years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017 – FY2024MaterialisedFY2025-H1 – FY20262017: 120172018: 020182019: 120192020: 120202021: 020212022: 020222023: 020232024: 220242025: 220252026: 32026
Same theme, other companies
Risks related to securing sites and properties for new stores and the progress of new constructionA theme 45 companies write about · 45 as a headwind · 0 as a tailwind

Chikaranomoto Holdings moved to the "Worse" side of this theme in 2024, the same year as the typical company in this theme.

The whole theme swung hardest in 2026: 6 of 14 companies on the "Worse" side.

2 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 45 companies compared. The sentences above are computed from all 45.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「The recognition of initial costs for developing new areas due to changes in new countries or trading areas, as well as increased costs resulting from delays in new store openings included in the plan, also affected operating profit.」

    Delays in new store openings included in the plan and initial costs for developing new areas actually occurred and affected operating profit.
  2. FY2026-H1MaterialisedAnnual report

    「The recognition of initial costs associated with developing new countries or areas, as well as increased costs resulting from delays in opening new stores included in the plan, also affected operating profit.」

    Delays in opening new stores included in the plan actually occurred, and initial costs and costs associated with the delays affected operating profit.
  3. FY2025MaterialisedAnnual report

    「Particularly in the United States, new store openings were significantly delayed due to delays in obtaining administrative approvals and permits and delays in construction by contractors.」

    For new store openings overseas, delays in obtaining approvals and permits and in construction actually occurred, affecting the failure to meet store opening plans and increasing costs.
  4. FY2025-H1MaterialisedAnnual report

    「The recognition of initial costs associated with developing new countries or areas, as well as increased costs resulting from delays in opening new stores included in the plan, also affected operating profit.」

    The document states that delays in opening new stores included in the plan actually occurred and that the resulting cost increases affected operating profit.
  5. FY2024RestatedAnnual report

    「If the number of properties meeting the Group's store opening requirements falls short of the number planned, or if openings are delayed due to delays in construction or other work, the Group's revenue and operating profit may decline.」

    The risk of failing to meet store opening plans due to insufficient properties or construction delays continues to be disclosed.
  6. FY2020RestatedAnnual report

    「If the number of properties meeting the Group's store opening requirements falls short of the number planned, or if openings are delayed due to delays in construction or other work, the Group may suspend execution of the plan,」

    The possibility of failing to meet store opening plans due to insufficient properties or construction delays continues to be disclosed.
  7. FY2019RestatedAnnual report

    「If the number of properties meeting the Group's store opening requirements falls short of the number planned, or if openings are delayed due to delays in construction or other work, the Group may suspend execution of the plan,」

    The possibility of failing to meet store opening plans due to insufficient properties or construction delays continues to be disclosed.
  8. FY2017First statedAnnual report

    「If the number of properties meeting the Group's store opening requirements falls short of the number planned, or if openings are delayed due to delays in construction or other work, the Group may suspend execution of the plan,」

    The document indicates that the policy of actively opening stores may not proceed as planned due to difficulties securing properties and construction delays.
Moved together

"Labor shortages and rising personnel costs" moved the same way as this thread, in the same document, in 6 of its 10 moves.

665432★123456
  1. ★This thread
  2. 1Labor shortages and rising personnel costs6×
  3. 2Changes in Dietary Habits Driven by the Rise of Delivery Services and Growing Environmental Awareness6×
  4. 3Difficulty procuring ingredients, soaring procurement costs, and import restrictions5×
  5. 4Country Risk in Overseas Markets and Local Partner Risk4×
  6. 5Profitability Pressure from Soaring Logistics Costs3×
  7. 6Foreign Exchange Volatility Associated with Global Operations2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Chikaranomoto Holdings yet. It last moved in the Earnings of 2026-05-14: "Materialised".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Shortage of Store Sites, Construction Delays, and Failure to Meet Store Opening Plans | CHIKARANOMOTO HOLDINGS Co.,Ltd. (3561) | Komori