Komori
Miyaji Engineering Group (3431) · RiskRestated

Serious Accident Risks Associated with Heavy-Load Installation

First written in FY2016. 11 of 12 entries say "Restated". Latest entry: FY2026-H1.

12entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2026-H12016: 120162017: 120172018: 120182019: 120192020: 320202021: 120212022: 120222023: 120232024: 120242025: 12025
Same theme, other companies
Accident and Disaster Risk at Equipment Installation and Machinery Manufacturing SitesA theme 9 companies write about · 9 as a headwind · 0 as a tailwind

4 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1RestatedAnnual report

    「During the interim consolidated accounting period, there were no new business or other risks, nor any material changes to the business or other risks described in the annual securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of serious accidents involving heavy loads during construction.
  2. FY2025-H1RestatedAnnual report

    「During the interim consolidated accounting period, there were no new business or other risks, nor any material changes to the business or other risks described in the annual securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of serious accidents involving heavy loads during construction.
  3. FY2023-Q3RestatedAnnual report

    「There were no newly arising business or other risks during the cumulative consolidated period for the third quarter. Nor were there any material changes to the business or other risks described in the securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of serious accidents involving heavy loads during construction.
  4. FY2023-Q2RestatedAnnual report

    「No new business or other risks arose during the six months ended 30 September. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of serious accidents involving heavy loads during construction.
  5. FY2022-Q2RestatedAnnual report

    「No new business or other risks arose during the six months ended 30 September. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of serious accidents involving heavy loads during construction.
  6. FY2021-Q2RestatedAnnual report

    「There were no newly arising business or other risks during the cumulative consolidated period for the second quarter. Nor were there any material changes to the business or other risks described in the securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of serious accidents involving heavy loads during construction.
  7. FY2020RestatedAnnual report

    「We make every effort to prevent accidents, including holding safety and health conferences for subcontractors, holding briefings on safety and health management policies, and establishing an emergency contact system in the event of an accident, but」

    The risk of serious accidents involving heavy loads during construction and the ongoing response through safety and health conferences, briefings and an emergency contact system continue.
  8. FY2020-Q3RestatedAnnual report

    「There were no newly arising business or other risks during the cumulative consolidated period for the third quarter. Nor were there any material changes to the business or other risks described in the securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of serious accidents involving heavy loads during construction.
  9. FY2020-Q2RestatedAnnual report

    「There were no newly arising business or other risks during the cumulative consolidated period for the second quarter. Nor were there any material changes to the business or other risks described in the securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of serious accidents involving heavy loads during construction.
  10. FY2018RestatedAnnual report

    「Any accident could become a serious accident. The Group makes every effort to prevent accidents, but if an accident were to occur, it could suffer not only direct losses but also reputational damage and administrative sanctions, such as suspension of designation by ordering authorities.」

    In addition to the risk of serious accidents associated with heavy-load construction and sites near operating railway lines and other facilities, the disclosure describes the possibility of reputational damage and administrative sanctions if an accident occurs.
  11. FY2017RestatedAnnual report

    「The Group's core business, construction of steel structures such as bridges, involves handling extremely heavy loads. Construction sites may also be located near urban areas, roads or operating railway lines, creating a risk that any accident could become a serious accident.」

    The risk of serious accidents arising from construction involving heavy loads and sites near urban areas, roads and operating railway lines was reiterated.
  12. FY2016First statedAnnual report

    「The Group's core business, construction of steel structures such as bridges, involves handling extremely heavy loads. Construction sites may also be located near urban areas, roads or operating railway lines, creating a risk that any accident could become a serious accident.」

    The disclosure describes the risk that an accident could become serious because bridge and other construction work involves heavy loads and is performed at sites with these characteristics.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Miyaji Engineering Group yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Serious Accident Risks Associated with Heavy-Load Installation | MIYAJI ENGINEERING GROUP,INC. (3431) | Komori