Komori
Miyaji Engineering Group (3431) · InitiativeRestated

Streamlining and Cost Reduction for Composite Deck Bridges: QS Bridge and QS Slab

First written in FY2017. 1 of 3 entries say "Softened", first in FY2018. Latest entry: FY2023.

3entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2017SoftenedFY20182017: 120172018: 120182019: 020192020: 020202021: 020212022: 020222023: 12023
Same theme, other companies
Streamlining and cost reduction for composite deck bridges and deck slabsA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2023RestatedAnnual report

    「For the composite deck bridge QS Bridge for the replacement of small- and medium-sized bridges and the steel-concrete composite deck QS Slab, we are continuing to examine rationalization of structures, fabrication and construction to reduce costs, as well as technical improvements accompanying updates to various standards.」

    For QS Bridge and QS Slab, cost reduction, rationalization and technical improvements accompanying updates to standards are continuing.
  2. FY2018SoftenedAnnual report

    「Because structural cost reductions have limitations and the product is less competitive than those of other companies, and because development costs for nondestructive testing methods to ensure quality, such as confirming concrete filling, may increase, we are considering the future direction of research from the perspectives of cost-effectiveness and marketability.」

    Regarding QS Slab, the description changed from continuing conventional improvements to reconsidering the future direction of research, citing limitations on cost reduction, competitiveness and inspection development costs.
  3. FY2017First statedAnnual report

    「For the composite deck bridge QS Bridge, the company is studying rationalisation and improvements in its structural design, fabrication and construction to give it cost and quality advantages over other structural forms, targeting the growing demand for replacement bridges of small and medium size for municipalities and other local authorities.」

    In anticipation of demand for replacement bridges of small and medium size, the company has identified the cost and quality advantages of QS Bridge and improvements in the constructability and economic efficiency of QS Slab as research themes.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Miyaji Engineering Group yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.