Komori
Miyaji Engineering Group (3431) · RiskReframed

Risk of damages arising from serious defects in constructed properties

First written in FY2016. 11 of 13 entries say "Restated". Latest entry: FY2026.

13entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2026-H12016: 120162017: 120172018: 120182019: 120192020: 320202021: 120212022: 120222023: 120232024: 120242025: 120252026: 12026
Same theme, other companies
Housing and Real Estate Construction Defect and Defect Liability RiskA theme 103 companies write about · 103 as a headwind · 4 as a tailwind

Miyaji Engineering Group moved to the "Worse" side of this theme in 2026, 4 years after the typical company in this theme (2022).

The whole theme swung hardest in 2026: 7 of 39 companies on the "Worse" side.

11 other companies' latest entry also says "Reframed".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 103 companies compared. The sentences above are computed from all 103.
Full recordFilings, disclosures and news, newest first
  1. FY2026ReframedAnnual report

    「If the Group incurs significant liability for nonconformity in a completed construction project, business performance could be affected.」

    The legal terminology was changed from the former expression "warranty liability for defects" to "liability for nonconformity." Quality control and systems for communication and information sharing when defects occur continue.
  2. FY2026-H1RestatedAnnual report

    「During the interim consolidated accounting period, there were no new business or other risks, nor any material changes to the business or other risks described in the annual securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of losses from major defects in completed construction projects.
  3. FY2025-H1RestatedAnnual report

    「During the interim consolidated accounting period, there were no new business or other risks, nor any material changes to the business or other risks described in the annual securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of losses from major defects in completed construction projects.
  4. FY2023-Q3RestatedAnnual report

    「No new business or other risks arose during the cumulative third quarter under review. In addition, there have been no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of losses from major defects in completed construction projects.
  5. FY2023-Q2RestatedAnnual report

    「No new business or other risks arose during the six months ended 30 September. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of losses from major defects in completed construction projects.
  6. FY2022-Q2RestatedAnnual report

    「No new business or other risks arose during the six months ended 30 September. There were also no material changes to the business and other risks described in the securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of losses from major defects in completed construction projects.
  7. FY2021-Q2RestatedAnnual report

    「During the first six months of the current consolidated fiscal year, there were no newly arising business or other risks. In addition, there were no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of losses from major defects in completed construction projects.
  8. FY2020RestatedAnnual report

    「The Group takes every possible measure to ensure quality control, including establishing departments responsible for safety and quality and securing a system for prompt communication and information sharing when defects occur, but」

    The response to the risk of major defects in completed construction projects through departments responsible for safety and quality and systems for communication and information sharing when defects occur continues.
  9. FY2020-Q3RestatedAnnual report

    「No new business or other risks arose during the cumulative third quarter under review. In addition, there have been no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of losses from major defects in completed construction projects.
  10. FY2020-Q2RestatedAnnual report

    「During the first six months of the current consolidated fiscal year, there were no newly arising business or other risks. In addition, there were no material changes to the business and other risks described in the annual securities report for the previous fiscal year.」

    It was stated that there were no material changes to the risk of losses from major defects in completed construction projects.
  11. FY2018RestatedAnnual report

    「The Group takes every possible measure to ensure quality control, but if it incurs significant liability for nonconformity in a completed construction project, business performance could be affected.」

    While carrying out quality control, the risk that liability for nonconformity arising from major defects in completed construction projects could affect business performance continues.
  12. FY2017RestatedAnnual report

    「The Group takes every possible measure to ensure quality control, but if it incurs significant liability for nonconformity in a completed construction project, business performance could be affected.」

    While carrying out quality control, the risk of losses arising from major construction defects continued to be disclosed.
  13. FY2016First statedAnnual report

    「The Group takes every possible measure to ensure quality control, but if it incurs significant liability for nonconformity in a completed construction project, business performance could be affected.」

    While carrying out quality control, the disclosure identifies liability for nonconformity arising from major defects in completed construction projects as a risk.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Miyaji Engineering Group yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of damages arising from serious defects in constructed properties | MIYAJI ENGINEERING GROUP,INC. (3431) | Komori