Results for this period
Full year1 April 2025–31 March 2026ConsolidatedJapanese GAAPThe width of the band at each stage is based on revenue. The narrower it becomes toward the bottom, the smaller the proportion of revenue that remains as profit. The dotted outline is the full-year forecast and the band inside it is the result for this period. The progress rate is the result divided by the forecast.
塗りつぶした部分が自己資本比率です。総資産のうち、返済のいらない自前の資金がどれだけかを表します。The thin vertical line indicates the level at the end of the previous fiscal year.
Stacked from zero: upward is an increase in cash, downward a decrease (in ¥ million).The net change represented by the dotted line is the total of three items, calculated from figures provided by the company.
Lower demand resulting from a temporary lull between projects, revisions to construction schedules due to labor shortages at worksites and other factors, higher personnel and other expenses in the research and development division, and the reversal of deferred tax assets.
No applicable matters.
| Item | Details |
|---|---|
| Fiscal Period Classification | Full year |
| Accounting standards | Japanese GAAP |
| Consolidated / non-consolidated | Consolidated |
| Period Covered | 1 April 2025–31 March 2026 |
| Net Sales | ¥25,401 million (YoY -1.9%) |
| Operating profit | ¥599 million (YoY -29.5%) |
| Ordinary income | ¥591 million (YoY -33.2%) |
| Profit attributable to owners of the parent | ¥-434 million |
| Net income per share | −¥14.40 |
| Operating Margin | 2.4% |
| Equity ratio | End of the current fiscal period 42.6% / End of previous period 44.0% |
| Total assets | ¥24,561 million |
| Net assets | ¥10,489 million |
| Cash flows from operating activities | ¥1,146 million |
| Cash flows from investing activities | ¥-793 million |
| Cash flows from financing activities | ¥-367 million |
| Cash and cash equivalents at end of period | ¥4,868 million |
| Full-year earnings forecast | Net Sales ¥25,000 million (YoY -1.6%) / Operating profit ¥603 million (YoY +0.7%) / Ordinary income ¥600 million (YoY +1.4%) / Net income ¥159 million |
| Annual Dividend Forecast | ¥13.00 → ¥12.00 |
| Payout ratio | Fiscal year ended March 2026: —; forecast for fiscal year ending March 2027: 226.8% |
| Shareholder Return Policy | Targeting a dividend on equity (DOE) ratio of at least 3.5% |
| Segment revenue | Manufacture and sale of construction equipment and materials ¥12,019.56 thousand (YoY -3.8%), Manufacture and sale of building materials ¥9,860.31 thousand (YoY -4.9%), Construction Consulting Business ¥687.16 thousand (YoY +8.0%), Repair and reinforcement construction ¥2,834.01 thousand (YoY +19.1%) |
| Segment profit | Manufacture and sale of construction equipment and materials ¥717.95 thousand (YoY -10.3%), Manufacture and sale of building materials ¥414.07 thousand (YoY -23.6%), Construction Consulting Business ¥36.20 thousand, Repair and reinforcement construction ¥249.27 thousand (YoY +3.8%) |
| Depreciation and amortization | ¥774,828 thousand |
| Breakdown of extraordinary income (loss) | Extraordinary income Gain on sale of non-current assets ¥4,006 thousand / Extraordinary loss Loss on sale of fixed assets ¥2,886 thousand, Loss on Disposal of Fixed Assets ¥6,325 thousand |
| Disclosure regarding the going concern assumption | No applicable matters. |
| Change in accounting policy | Changes due to revisions to standards No / Other changes No / Change in accounting estimate Yes / Restatement No |
| Changes in the scope of consolidation | 0 additions, 0 exclusions (no material changes) |
| Material subsequent events | No applicable matters. |
| Availability of Supplementary Financial Results Materials | Yes |
| Availability of Financial Results Briefing | Yes (for institutional investors and analysts, scheduled for 1 June 2026) |
| Issued Shares at Period-End | 31,256,600 shares |
| Treasury Shares at Period-End | 1,048,528 shares |
| Factors Behind Changes in Business Performance | Lower demand resulting from a temporary lull between projects, revisions to construction schedules due to labor shortages at worksites and other factors, higher personnel and other expenses in the research and development division, and the reversal of deferred tax assets. |
Items this document does not state (4)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.Lower demand resulting from a temporary lull between projects, revisions to construction schedules due to labor shortages at worksites and other factors, higher personnel and other expenses in the research and development division, and the reversal of deferred tax assets.