Komori
Other Disclosures3355KURIYAMA HOLDINGS CORPORATIONTrading & Wholesale

Kuriyama Group Completes Its New Research and Development Facility, the Kuriyama R&D Center, in Higashihiroshima City with a View to the Next Generation, Beginning Full-Scale Operations as a Global R&D Hub

A new research and development facility, the “Kuriyama R&D Center,” was constructed in Higashihiroshima, Hiroshima Prefecture, and completed on 29 May 2026. Research equipment will be relocated from the former facility, and Kuriyama R&D Co., Ltd. is scheduled to formally relocate to the new facility and begin full-scale operations on 3 July.

Worth reading
62In focus
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Improvement
Direction inferred from the company’s description.
Scale
30
Approximately ¥3.0 billion (total investment)
Wording
Conditional
How definitive the wording is.

Announced details

Kuriyama R&D Center
Applicable field (uses covered by this announcement)

Research and development, various testing and inspections, intellectual property creation and management, and engineer development

Launch date3 July 2026 (scheduled; formal relocation and commencement of full-scale operations)
What the company reported numerically
Quantitative Effects

A real reduction of at least 75% in primary energy consumption

Relationship between the counterparty and the company
KURIYAMA HOLDINGS CORPORATION3355
Relationship with the Company

Kuriyama Group’s research and development facility. It will be used by Kuriyama R&D Co., Ltd., the Group’s core operating company responsible for research and development.

Award/certification name

Nearly ZEB rating

Awarding / certifying body

BELS (Building Energy-efficiency Labeling System)

Location (as indicated in this announcement)

1-6-19 Hachihonmatsu-Iida, Higashihiroshima, Hiroshima Prefecture 739-0146, Japan

Site area: 4,762.97 m²; total floor area: 3,363.79 m²; steel-frame construction with 3 aboveground floors. The large test room is more than 30 m long, the second-floor gallery is more than 30 m long, and the facility has a 190-inch large LED display.
Impact on Business Performance

The disclosure states that the Company aims to enhance product competitiveness by creating new and high-value-added products, increase corporate value over the medium to long term, and achieve sustainable growth. The specific impact on earnings is not disclosed.

The company does not address Contract Value / Offering price.

Announced details
ItemDetails
Names of Products / Services CoveredKuriyama R&D Center
Relationship with the CompanyKuriyama Group’s research and development facility. It will be used by Kuriyama R&D Co., Ltd., the Group’s core operating company responsible for research and development.
Launch date3 July 2026 (scheduled; formal relocation and commencement of full-scale operations)
Applicable areaResearch and development, various testing and inspections, intellectual property creation and management, and engineer development
Award/certification nameNearly ZEB rating
Awarding / certifying bodyBELS (Building Energy-efficiency Labeling System)
Location1-6-19 Hachihonmatsu-Iida, Higashihiroshima, Hiroshima Prefecture 739-0146, Japan
Location scaleSite area: 4,762.97 m²; total floor area: 3,363.79 m²; steel-frame construction with 3 aboveground floors. The large test room is more than 30 m long, the second-floor gallery is more than 30 m long, and the facility has a 190-inch large LED display.
Quantitative EffectsA real reduction of at least 75% in primary energy consumption
Impact on Business PerformanceThe disclosure states that the Company aims to enhance product competitiveness by creating new and high-value-added products, increase corporate value over the medium to long term, and achieve sustainable growth. The specific impact on earnings is not disclosed.
Items this document does not state (8)
CounterpartyCounterparty overviewContract ValueOffering priceContract DateRegistration number and expiry dateUsage historySource

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

To consolidate the Group’s information, technologies, human resources and intellectual property, accelerate commercialization through the integration of intellectual property creation and management and testing and inspection functions, facilitate the transfer of technical expertise, and develop engineers. The Group aims to create new and high-value-added products, enhance product competitiveness, rapidly expand into global markets, increase corporate value over the medium to long term, and achieve sustainable growth.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.
Corrections happenIf the company reissues this disclosure, the page is rebuilt from the corrected version and the revision number moves up.
Kuriyama Group Completes Its New Research and Development Facility, the Kuriyama R&D Center, in Higashihiroshima City with a View to the Next Generation, Beginning Full-Scale Operations as a Global R&D Hub | KURIYAMA HOLDINGS CORPORATION (3355) timely disclosure | Komori