Announced details
Commercial tenant buildings, land development, local revitalization
A contracted project in which the Group handles planning, design, construction and related activities in response to the landowner’s intention to develop the site.
2-27-12 Minami-Urawa, Minami-ku, Saitama City, Saitama Prefecture
In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.
| Item | Details |
|---|---|
| Names of Products / Services Covered | Phil Park Minami-Urawa |
| Relationship with the Company | A contracted project in which the Group handles planning, design, construction and related activities in response to the landowner’s intention to develop the site. |
| Launch date | 31 March 2026 (construction completed) |
| Applicable area | Commercial tenant buildings, land development, local revitalization |
| Location | 2-27-12 Minami-Urawa, Minami-ku, Saitama City, Saitama Prefecture |
| Location scale | Site area: 92.00 m² (27.83 tsubo); three-story above-ground steel-frame structure |
Items this document does not state (12)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.In response to the landowner’s desire to develop the site in a way that would contribute more to local revitalization, the “Phil Park” concept was adopted. The stated objectives also included improving the building’s visibility, contributing to a safe living environment in the community, and creating a space that could accommodate tenants from a diverse range of industries.