Prioritizing peace of mind and safety through seismic isolation and earthquake-resistant measures

First written in FY2018-Q1. 16 of 19 entries say "Restated". Latest entry: 2026-06-02.

19entries
10years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2018-Q1 – FY2023-Q3AdvancedFY2024-Q1 – FY2024-Q22017: 220172018: 420182019: 320192020: 420202021: 120212022: 120222023: 320232024: 020242025: 020252026: 12026
Same theme, other companies
Establishing a Seismic Resilience, Safety and Peace-of-Mind Housing BrandA theme 4 companies write about · 0 as a headwind · 4 as a tailwind

0 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-06-02RestatedGeneral Meetings of Shareholders

    「事業用地の仕入れ段階から建設会社と連携し、構造面の「安心・安全」を確保した上で極力原価を抑えることに協働して取り組む」

    建設会社との早期連携、安心・安全の確保、原価抑制の施策を再確認した。
  2. FY2024-Q2AdvancedAnnual report

    「As the third property in the series, sales of Crea Next Onoe Residence (Higashi-ku, Kumamoto, Kumamoto Prefecture; 14 above-ground floors; 79 units; scheduled for handover in March 2025; joint business partner: 株式会社九電工) began in late September 2023. This advanced condominium development combines ZEH-M Oriented (energy efficiency), a seismic-isolation structure and all-electric systems.」

    The third joint-development property with 株式会社九電工 adopted specific safety, security and environmental features combining ZEH-M Oriented, a seismic-isolation structure and all-electric systems, and sales commenced.
  3. FY2024-Q1AdvancedAnnual report

    「This property is an advanced condominium development combining ZEH-M Oriented, a seismic-isolation structure and all-electric systems.」

    The joint-development property incorporates specific safety, security and environmental features combining ZEH-M Oriented, a seismic-isolation structure and all-electric systems.
  4. FY2023-Q3RestatedAnnual report

    「We are focusing on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, carefully assessing customers' price absorption capacity and ability to keep pace in each region, and setting prices within their reach.」

    The policy of controlling costs while prioritising peace of mind and safety and setting prices based on price absorption capacity and the ability to keep pace in each region was continued.
  5. FY2023-Q2RestatedAnnual report

    「We are focusing on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, carefully assessing customers' price absorption capacity and ability to keep pace in each region, and setting prices within their reach.」

    The policy of controlling costs while prioritising peace of mind and safety and setting prices based on price absorption capacity and the ability to keep pace in each region was continued.
  6. FY2021-Q3RestatedAnnual report

    「We are focusing on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, and setting prices within customers' reach.」

    The policy of controlling costs while giving top priority to structural safety and peace of mind and setting affordable prices was continued.
  7. FY2021-Q2RestatedAnnual report

    「Regarding selling prices, the company is focusing on setting prices within customers' reach by actively exchanging information with construction companies from the time it acquires development land, prioritising safety and security, particularly in terms of structural design, and keeping costs as low as possible.」

    The policy of controlling costs while giving top priority to structural safety and peace of mind and setting affordable prices was continued.
  8. FY2021-Q1RestatedAnnual report

    「We are focusing on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, and setting prices within customers' reach.」

    The policy of controlling costs while giving top priority to structural safety and peace of mind and setting affordable prices was continued.
  9. FY2020RestatedAnnual report

    「For disaster preparedness, we refer to municipal hazard maps and implement the necessary measures when developing properties in areas at risk of flooding.」

    The policy of prioritising peace of mind and safety was reaffirmed, and specific measures relating to disaster preparedness were described.
  10. FY2020-Q3RestatedAnnual report

    「We are focusing on setting prices within customers' reach by, among other measures, keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design.」

    The policy of controlling costs while prioritising structural safety and peace of mind and setting affordable prices was continued.
  11. FY2020-Q2RestatedAnnual report

    「We are focusing on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, and setting prices within customers' reach.」

    The policy of controlling costs while giving top priority to structural safety and peace of mind and setting affordable prices was continued.
  12. FY2020-Q1RestatedAnnual report

    「We are focusing on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, and setting prices within customers' reach.」

    The policy of controlling costs while giving top priority to structural safety and peace of mind and setting affordable prices was continued.
  13. FY2019RestatedAnnual report

    「We aim to deepen relationships with each construction company and hold discussions from the land-planning stage, while prioritising structural safety and peace of mind and seeking to reduce construction costs.」

    The policy of consulting with construction companies from the land-planning stage and prioritising structural safety and peace of mind was reaffirmed.
  14. FY2019-Q2RestatedAnnual report

    「In addition, through active information exchange with construction companies from the land-acquisition stage, we are focusing on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, and setting prices within customers' reach.」

    The policy of controlling costs and setting affordable prices while prioritising structural safety and peace of mind through information exchange with construction companies was continued.
  15. FY2019-Q1RestatedAnnual report

    「Through active information exchange, we are focusing on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, and setting prices within customers' reach.」

    The policy of controlling costs and setting affordable prices while prioritising structural safety and peace of mind through information exchange with construction companies was continued.
  16. FY2018RestatedAnnual report

    「Through active information exchange, we will focus on keeping costs as low as possible while prioritising peace of mind and safety, particularly in terms of structural design, and setting prices within customers' reach.」

    The policy of prioritising structural safety and peace of mind while controlling costs and aiming for affordable pricing through information exchange with construction companies was reaffirmed.
  17. FY2018-Q3RestatedAnnual report

    「③ Prioritising peace of mind and safety above all else, particularly in terms of structural design」

    The product-development policy of prioritising peace of mind and safety above all else, particularly in terms of structural design, was reaffirmed as one of 5 items.
  18. FY2018-Q2RestatedAnnual report

    「③ Prioritising peace of mind and safety above all else, particularly in terms of structural design」

    The product-development policy of prioritising peace of mind and safety above all else, particularly in terms of structural design, was reaffirmed.
  19. FY2018-Q1First statedAnnual report

    「Various earthquake-resistance measures, including seismic-isolation structures, in areas that have experienced major earthquakes and areas where such earthquakes are anticipated」

    Newly specified seismic-resistance measures, including seismic-isolation structures, as a product-development initiative in areas that have experienced major earthquakes and areas where such earthquakes are anticipated.
Moved together

"Strengthening the growth platform through a capital and business alliance with Kyudenko and a third-party allotment of new shares" moved the same way as this thread, in the same document, in 2 of its 19 moves.

222★123
  1. ★This thread
  2. 1Strengthening the growth platform through a capital and business alliance with Kyudenko and a third-party allotment of new shares2×
  3. 2Strengthening Product Development Capabilities in Environmental Protection, Disaster Preparedness and Post-COVID-19 Response2×
  4. 3Launch of the joint business brand “クレアネクスト” and release of its first property2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Central General Development yet. It last moved in the General Meetings of Shareholders of 2026-06-02: "Restated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Prioritizing peace of mind and safety through seismic isolation and earthquake-resistant measures | CENTRAL GENERAL DEVELOPMENT CO.,LTD. (3238) | Komori