Shirohato (3192) · RiskMaterialised

Logistics system failures and shipping operation disruptions following the relocation of the head office

First written in FY2021-Q2. 2 of 3 entries say "Materialised", first in FY2021-Q2. Latest entry: FY2021.

3entries
2years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2021-Q2MitigatedFY2021-Q32020: 120202021: 22021
Same theme, other companies
Systems and Communications Infrastructure Failure RiskA theme 223 companies write about · 223 as a headwind · 2 as a tailwind

The whole theme swung hardest in 2026: 16 of 81 companies on the "Worse" side.

9 other companies' latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 199 companies compared. The sentences above are computed from all 199.Comparing 200 of the theme's 225 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2021MaterialisedAnnual report

    「Although sales exceeded the plan, lost sales opportunities also resulted from logistics system problems and delays in shipment operations that occurred immediately after the new head office relocation, damaging customer trust.」

    Logistics system problems and shipment delays after the head office relocation were reflected in full-year results as lost sales opportunities and damage to customer trust.
  2. FY2021-Q3MitigatedAnnual report

    「Shipment volume, which had declined due to problems with the logistics system and delays in shipment operations after the relocation, improved, and third-quarter sales performed well.」

    Regarding the decline in shipment volume caused by logistics system problems and shipment-operation delays after the relocation that occurred in the previous quarter, shipment volume improved and third-quarter sales were described as performing well.
  3. FY2021-Q2MaterialisedAnnual report

    「In addition to the period during which inbound and outbound shipments were suspended in connection with the August head office relocation, problems with the logistics system and delays in shipment operations after the relocation caused a significant decline in shipment volume, and August sales were substantially below those of the same month of the previous year.」

    Problems with the logistics system and delays in shipment operations occurred after the head office relocation, resulting in a significant decline in shipment volume and a substantial year-on-year decrease in August sales.
Moved together

"Risk of Reliance on Financial Institution Borrowings and Funding Constraints" moved the same way as this thread, in the same document, in 2 of its 3 moves.

222★123
  1. ★This thread
  2. 1Risk of Reliance on Financial Institution Borrowings and Funding Constraints2×
  3. 2Growth in Revenue and Profit2×
  4. 3Strengthening Creditworthiness and the Financial Base Through Participation by Major Capital Partners2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Shirohato's next results are scheduled for 2026-10-09. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Logistics system failures and shipping operation disruptions following the relocation of the head office | Shirohato Co.,Ltd. (3192) | Komori