Rising Labor Costs Due to Labor Shortages
First written in FY2017. 17 of 20 entries say "Restated". Latest entry: FY2026.
The whole theme swung hardest in 2025: 36 of 59 companies on the "Worse" side.
36 other companies' latest entry also says "Restated".
- FY2026RestatedAnnual report
「In addition, various costs, including raw materials, utilities and logistics, as well as higher labor costs associated with labor shortages, are expected to rise. There are also downside risks from foreign exchange movements, and the challenging operating environment continues, leaving no room for complacency.」
Continues to identify higher labor costs associated with labor shortages, together with raw material, utility, logistics and foreign exchange costs, as factors contributing to the challenging operating environment. - FY2025RestatedAnnual report
「In addition, various costs, including higher labor costs associated with labor shortages, are expected to rise.」
Continues to identify higher labor costs associated with labor shortages as a cost increase expected in the future. - FY2025-H1RestatedAnnual report
「In addition, various costs, including raw materials, utilities and logistics, as well as higher labor costs associated with labor shortages, are expected to rise.」
Continues to identify higher labor costs associated with labor shortages, together with raw material, utility and logistics costs, as a cost increase expected in the future. - FY2025-Q1RestatedAnnual report
「In addition, various costs, including raw materials, utilities and logistics, as well as higher labor costs associated with labor shortages, are expected to rise.」
Continues to identify higher labor costs associated with labor shortages, together with raw material, utility and logistics costs, as a cost increase expected in the future. - FY2024-Q3RestatedAnnual report
「In addition, various costs, including raw materials, labor and logistics, continue to rise, and further cost increases are expected.」
Continues to identify rising labor costs, together with raw material and logistics costs, as a cost factor that continues to rise and is expected to increase further. - FY2024-Q2RestatedAnnual report
「In addition, increases in various costs, including raw materials, labor and logistics, have exceeded the range that can be addressed through corporate efforts, and further cost increases are expected.」
Continues to identify rising labor costs, together with raw material and logistics costs, as a cost increase that has exceeded the range that can be addressed through corporate efforts. - FY2023-Q3RestatedAnnual report
「Increases in various costs, including raw materials, labor, logistics and utilities, are exceeding the range that can be addressed through corporate efforts.」
Continues to identify rising labor costs, together with raw material, logistics and utility costs, as a cost increase that has exceeded the range that can be addressed through corporate efforts. - FY2023-Q2RestatedAnnual report
「In addition, increases in various costs, including raw materials, labor and logistics, are beginning to exceed the range that can be addressed through corporate efforts.」
Continues to identify rising labor costs, together with raw material and logistics costs, as a cost increase that is beginning to exceed the range that can be addressed through corporate efforts. - FY2023-Q1WorsenedAnnual report
「Increases in various costs, including raw materials, labor and logistics, are beginning to exceed the range that can be addressed through corporate efforts.」
Identifies rising labor costs, together with raw material and logistics costs, as a cost increase that is beginning to exceed the range that can be addressed through corporate efforts. - FY2020-Q3RestatedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment increasingly challenging.」
Continues to state that labor costs driven by labor shortages have risen further. - FY2020-Q2RestatedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment increasingly challenging.」
Continues to state that labor costs driven by labor shortages have risen further. - FY2020-Q1RestatedAnnual report
「In addition, higher labor costs driven by labor shortages have made the operating environment increasingly challenging.」
Continues to state that higher labor costs driven by labor shortages are making the operating environment challenging. - FY2019RestatedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment increasingly challenging.」
Continues to state that labor costs driven by labor shortages have risen further. - FY2019-Q3RestatedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment more challenging.」
As in the previous quarter, states that labor costs driven by labor shortages have risen further. - FY2019-Q2RestatedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment increasingly challenging.」
Continues to state that labor costs driven by labor shortages have risen further. - FY2019-Q1RestatedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment increasingly challenging.」
Continues to state that labor costs driven by labor shortages have risen further. - FY2018-Q3RestatedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment increasingly challenging.」
Continues to state that labor costs driven by labor shortages have risen further. - FY2018-Q2RestatedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment increasingly challenging.」
As in the previous quarter, states that labor costs driven by labor shortages have risen further. - FY2018-Q1WorsenedAnnual report
「In addition, labor costs driven by labor shortages have risen further, making the operating environment increasingly challenging.」
In addition to the previous recognition of labor shortages and rising labor costs, the wording that labor costs are rising "further" indicates that the risk is worsening. - FY2017First statedAnnual report
「In addition, higher labor costs associated with labor shortages have also contributed, making the operating environment increasingly challenging.」
Identifies labor shortages and the resulting increase in labor costs as factors making the current operating environment challenging.