Announced details
Low-voltage grid-connected battery storage systems; solar power generation and battery storage; primary balancing capacity (offline) in the balancing market
Assumes sufficient reserve capacity to respond to commands for approximately one hour. Limiting capacity reduces the possibility of being classified as a small quantity of hazardous material under the Fire Service Act.
JB Sustainable handles and offers RENON products for advance sale. Capital and personnel relationships: not disclosed
JC-STAR Level 1 (application planned)
Equipment output: 49.9kW; battery storage capacity: 133kWh
Individual quotations based on the installation site requirements
The company does not address Contract Value / Impact on Business Performance.
Agency for Natural Resources and Energy, 21st Grid Code Study Group (31 March 2026) and related materials
| Item | Details |
|---|---|
| Names of Products / Services Covered | RENON low-voltage grid-connected battery storage system, 49.9kW/133kWh |
| Counterparty | RENON |
| Relationship with the Company | JB Sustainable handles and offers RENON products for advance sale. Capital and personnel relationships: not disclosed |
| Offering price | Individual quotations based on the installation site requirements |
| Launch date | 27 November 2026 (advance sales commenced; actual) |
| Applicable area | Low-voltage grid-connected battery storage systems; solar power generation and battery storage; primary balancing capacity (offline) in the balancing market |
| Award/certification name | JC-STAR Level 1 (application planned) |
| Location scale | Equipment output: 49.9kW; battery storage capacity: 133kWh |
| Quantitative Effects | Assumes sufficient reserve capacity to respond to commands for approximately one hour. Limiting capacity reduces the possibility of being classified as a small quantity of hazardous material under the Fire Service Act. |
| Source | Agency for Natural Resources and Energy, 21st Grid Code Study Group (31 March 2026) and related materials |
Items this document does not state (8)
These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.
The reasons the company gives
The company's own explanation, not something inferred from the numbers.In light of the policy that JC-STAR Level 1-certified products will be required for low-voltage projects applying for a grid interconnection contract from October 2027 onward, to introduce at an early stage equipment that can continue to be used after the requirements take effect to businesses that own land.