Komori
Kobe Bussan (3038) · InitiativeRestated

Operation of Woody Biomass Power Plants

First written in FY2019-Q1. 19 of 20 entries say "Restated". Latest entry: FY2026-H1.

20entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2019-Q1 – FY2026-H12019: 320192020: 420202021: 320212022: 220222023: 320232024: 320242025: 120252026: 12026
Same theme, other companies
Maintaining high utilization of existing woody biomass power plantsA theme 5 companies write about · 3 as a headwind · 4 as a tailwind

0 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1RestatedAnnual report

    「The power plants currently in operation comprise 19 solar power plants with approximately 81.0 MW and 1 woody biomass power plant with approximately 6.2 MW, all of which are operating smoothly.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues.
  2. FY2024RestatedAnnual report

    「The power plants currently in operation comprise 19 solar power plants with approximately 81.0 MW and 1 woody biomass power plant with approximately 6.2 MW, all of which are operating smoothly.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues.
  3. FY2024-Q2RestatedAnnual report

    「The power plants currently in operation comprise 19 solar power plants with approximately 81.0 MW and 1 woody biomass power plant with approximately 6.2 MW, all of which are operating smoothly.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues, and the solar power plants are also operating smoothly.
  4. FY2024-Q1RestatedAnnual report

    「The power plants currently in operation comprise 19 solar power plants with approximately 81.0 MW and 1 woody biomass power plant with approximately 6.2 MW, all of which are operating smoothly.」

    The 1 woody biomass power plant continues to operate at approximately 6.2 MW, while the 19 solar power plants, with approximately 81.0 MW, are also operating smoothly.
  5. FY2023RestatedAnnual report

    「The 1 woody biomass power plant generates approximately 6.2 MW.」

    The operation of 1 woody biomass power plant in Shiranuka Town, Hokkaido, with approximately 6.2 MW continues.
  6. FY2023-Q3RestatedAnnual report

    「The operating power plants and their generation capacity are 18 solar power plants with approximately 51.0 MW and 1 woody biomass power plant with approximately 6.2 MW, and the existing power plants also continue to operate smoothly.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues.
  7. FY2023-Q2RestatedAnnual report

    「The operating power plants and their generation capacity are 18 solar power plants with approximately 51.0 MW and 1 woody biomass power plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues.
  8. FY2023-Q1RestatedAnnual report

    「The operating power plants and their generation capacity are 18 solar power plants with approximately 51.0 MW and 1 woody biomass power plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues.
  9. FY2022-Q2RestatedAnnual report

    「The currently operating power plants and their generation capacity are 17 solar power plants with approximately 32.1 MW and 1 woody biomass power plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues.
  10. FY2022-Q1RestatedAnnual report

    「The currently operating power plants and their generation capacity are 17 solar power plants with approximately 32.1 MW and 1 woody biomass power plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues.
  11. FY2021-Q3RestatedAnnual report

    「The woody biomass power plant remains at 1 plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant with approximately 6.2 MW continues.
  12. FY2021-Q1RestatedAnnual report

    「The operating power plants and their generation capacity are unchanged from the end of the previous consolidated fiscal year: 16 solar power plants with approximately 22.0 MW and 1 woody biomass power plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant in Hokkaido with approximately 6.2 MW continues.
  13. FY2020RestatedAnnual report

    「The woody biomass power plant remains at 1 plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant in Hokkaido with approximately 6.2 MW continues.
  14. FY2020-Q3RestatedAnnual report

    「The operating power plants and their generation capacity are 16 solar power plants with approximately 22.0 MW and 1 woody biomass power plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant in Hokkaido with approximately 6.2 MW continues.
  15. FY2020-Q2RestatedAnnual report

    「The operating power plants and their generation capacity are 16 solar power plants with approximately 22.0 MW and 1 woody biomass power plant with approximately 6.25 MW.」

    The operation of 1 woody biomass power plant in Hokkaido with approximately 6.25 MW continues.
  16. FY2020-Q1RestatedAnnual report

    「The operating power plants and their generation capacity are unchanged from the end of the previous consolidated fiscal year: 16 solar power plants with approximately 22.0 MW and 1 woody biomass power plant with approximately 6.2 MW.」

    The operation of 1 woody biomass power plant in Hokkaido with approximately 6.2 MW continues.
  17. FY2019RestatedAnnual report

    「The woody biomass power plant in Shiranuka Town, Shiranuka District, Hokkaido, generates approximately 6.2 MW.」

    The operation in Hokkaido of a woody biomass power plant generating approximately 6.2 MW continues.
  18. FY2019-Q3RestatedAnnual report

    「In addition, the Company operates a woody biomass power plant in Hokkaido, generating approximately 6.25 MW.」

    The operation in Hokkaido of a woody biomass power plant generating approximately 6.25 MW continues.
  19. FY2019-Q2RestatedAnnual report

    「In addition, the Company operates a woody biomass power plant in Hokkaido, generating approximately 6.25 MW.」

    The operation in Hokkaido of a woody biomass power plant generating approximately 6.25 MW continues.
  20. FY2019-Q1First statedAnnual report

    「In addition, the Company operates a woody biomass power plant in Hokkaido, generating approximately 6.25 MW.」

    The operation of a woody biomass power plant in Hokkaido generating approximately 6.25 MW is disclosed for the first time.
Moved together

None of this company's other threads moved the same way in the same document twice or more.

When this could move next
No upcoming earnings preview for Kobe Bussan yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Operation of Woody Biomass Power Plants | KOBE BUSSAN CO.,LTD. (3038) | Komori