LA Holdings (2986) · RiskRestated
Risk of Construction Delays Caused by Disasters, Contractor Insolvency or Breach of Contract
First written in FY2022. 1 of 2 entries say "Restated". Latest entry: FY2024.
2entries
3years
0from disclosures
How it moved
Same theme, other companies
Risks related to difficulty securing outsourced and construction contractors, contract performance, and quality deteriorationA theme 134 companies write about · 136 as a headwind · 1 as a tailwind
The whole theme swung hardest in 2026: 14 of 57 companies on the "Worse" side.
81 other companies' latest entry also says "Restated".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 134 companies compared. The sentences above are computed from all 134.Full recordFilings, disclosures and news, newest first
- FY2024RestatedAnnual report
「当社グループの基準に適合した外部業者に委託しております。また、外注先との間で、品質の確保及び工程の管理のために、当社グループ社員が随時会議等に参加し、報告を受ける」
外部工事業者の災害・倒産・契約不履行リスクに対し、業者選定、会議参加及び報告確認を継続している。 - FY2022First statedAnnual report
「工事現場における災害の発生、外部業者からの虚偽の報告、外部業者の倒産や契約不履行等、当社グループが予期しない事態が発生し、工事の遅延や停止が発生した場合には、当社グループの業績に影響を及ぼす可能性があります。」
基準に適合した外部業者への委託、品質・工程管理のための会議参加や報告確認を対策として記載した。