Landix (2981) · RiskMaterialised
Higher Demolition and Construction Costs Due to Construction-Labor Shortages
First written in FY2024-Q1. 1 of 1 entries say "Materialised", first in FY2024-Q1. Latest entry: FY2024-Q1.
1entries
1years
0from disclosures
How it moved
Same theme, other companies
Schedule Delays and Rising Labor Costs Due to a Shortage of Skilled Construction WorkersA theme 16 companies write about · 16 as a headwind · 0 as a tailwind
Landix moved to the "Worse" side of this theme in 2023, the same year as the typical company in this theme.
The whole theme swung hardest in 2024: 8 of 11 companies on the "Worse" side.
0 other companies' latest entry also says "Materialised".
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 16 companies compared. The sentences above are computed from all 16.Full recordFilings, disclosures and news, newest first